Security deposit : last date to submit by speed post Issued from to TENDER DOCUMENT

Size: px
Start display at page:

Download "Security deposit : last date to submit by speed post Issued from to TENDER DOCUMENT"

Transcription

1 क द र य द द य लय स दनक द ह र द ल ल -34 F. No.38/KVSV/ / द न क: Bid security (EMD): Rs 10000=00 Sale Price of Tender document : Rs Security deposit : last date to submit by speed post Issued from to To, TENDER DOCUMENT KENDRIYA VIDYALAYA SAINIK VIHAR,DELHI-34 TELEPHONE: FAX: Sub: "Inviting Bid for engaging Service Provider Firm for providing Manpower (House Keeping) including material through service contract. Sir/Madam, The Kendriya Vidyalaya Sangathan, a centrally funded Autonomous Body, is a Society registered under Societies Registration Act, The Sangathan administers the Scheme of Kendriya Vidyalayas set up for imparting education to the children of transferable Central Govt. Employees among others. 2. Sealed competitive Bids are invited by the Kendriya Vidyalaya Sainik Vihar, Delhi from reputed/registered Consultant/Service Provider Firm for providing Manpower including material through service contract initially for a period of 01 (one) year w.e.f the date of agreement (which may be extended for another one year), as indicated below:- A. Area of the Building 8.5 Acre (Including building area and ground) Class Rooms, Other Rooms,Rooms in the barrack,laboratories, Computer Labs Staff Room, Library, Exam Room, Corridors,Office,Principal room, Play Ground etc. 1

2 B. Address/Location of the Kendriya Vidyalaya Building Sainik Vihar, Delhi Man power required:- S. No. Category of Manpower Minimum qualifications or/and experience Number of workers required 1. Workers for Cleanliness (Male) 2 Worker for cleanliness (Female) Primary standard Primary standard Approx Approx Total six workers for cleanliness of Class Rooms, office Rooms, Labs,Library room, Principal room, Office room, Examination room Toilets,corridors etc. and contracting agency will supervise the work. An outline of tasks to be carried out by different category of manpower provided is detailed as under:- S.No. Category of Responsibilities Manpower 1. Contracting Agency to supervise To supervise the workers deployed for cleanliness/filling of water in desert coolers etc and to look after overall cleanliness 2. Workers for cleanliness in Kendriya Vidyalaya Sainik Vihar. To clean the Vidyalaya building wherever he/she is deputed by the contracting agency. C. Material for cleanliness to be used as per attached Annexure B. The cost of material, however, will be charged extra by the Contracting Agency by showing rate of the same in attached Annexure -B :- D. Work will have to be got done in the following way:- i) Sweeping of entire area of the building and surroundings of building and collection of all waste material and disposal of the same as per instructions of the K.V. Sainik Vihar,Delhi. ii) Cleaning of the floor area with wet floor dusters and detergent disinfectants etc. once in the morning before opening the office and thereafter every 2 hours specially in the areas like corridors, stairs and reception etc. Spraying of flit/anti-termite treatment & rodent control etc. are to be made daily and whenever necessary, for keeping the rooms/sections free from mosquitoes, flies, termite/pests/rats etc. iii) Cleaning and washing of toilets and urinals using detergent and disinfectants atleast 4- iv) 5 times in a day. Cleaning of carpets of the officers room with vacuum cleaner to be provided by the Contractor. v) Sweeping and cleaning of open areas, roads, passage, lawns, auditoriums/meeting halls/canteen etc. within the boundary of the Vidyalaya s wall surroundings to this building. 2

3 vi) vii) viii) ix) Regular dusting/cleaning of office furniture (table and chair) and equipments, telephones, book cases, filing cabinets, almirahs and doors and windows including removal of cobwebs every day before opening of the Vidyalaya i.e a.m. Provisions of soap and liquid soap of good quality in the toilets and placing sufficient quantity of naphthalene balls/cakes and odonil cakes in the urinals. The Contracting Agency will ensure that the toiletries mentioned above are always available near each washbasin in the building. List of items/cleaning material required is attached vide Annexure-B. The choking of the sanitary installations e.g. w.c s Traps, Bottle traps, gully traps etc. is to be cleared within 24 hours of noticing the complaint. x) All complaints of leakage in the GI & CI pipes etc. are also to be attended within 24 hours. xi) Filling of water in all desert coolers. xii) xiii) Putting of Kerosene Oil in Desert coolers on each Saturday /last working day of the week during the Summer season when coolers are in operation and also cleaning of water tank of desert coolers with dusters every week throughout the year in order to make them dry when they are not in use. Cleaning of drains and putting of kerosene oil on each Saturday/week. ITEMS OF WORK TO BE DONE ONCE IN A WEEK ON EVERY SATURDAY i. Washing and Scrubbing of floor areas with detergents and dirt removing agent. ii. Cleaning of sanitary wares with appropriate cleaning agents without damaging their shines. iii. Removing stains from floors, doors and partitions by using surf orany suitable detergent as are found necessary without leaving any undesirable post cleaning marks. iv. Cleaning of filled surfaces in the corridors and staircases. v. Cleaning of water storage tanks, water coolers, desert coolers. vi. Cleaning of name plates and number plates (on each floor) and cleaning of all other name plates/boards. vii. Dusting and cleaning of fans, electrical fittings, door and window panes with glass cleaning chemical/agents and cleaning of partition, paneling etc. including removal of cob webs. 1. Quoted price a. The bidder shall quote unit rate which shall comprise of services charges(including profit & administrative charges) in the format of quotation only attached (Annexure A ). The minimum wages which will not be less than the maximum of the two minimum wages 1. Central govt. labour commissioner rate 2. Collector rate for Distt. North West as declared time to time will be payable. EPF, ESI will be paid at the rate applicable. Any other tax liable to be paid by the client shall be quoted by the bidder separately in Annexure A. b. Service tax is not applicable for services provided to educational institutions. c. Hourly rate of OTA should not exceed monthly remuneration. 30x8 d. The rate quoted shall be fixed for the duration of the contract and shall not be subject to adjustment except the statutory provisions, if amended. In case of change in rate due to statutory provisions only such changes will be accepted and not any additional liability i.e. % of profit/service charge s etc. As such the bidder while submitting the bid should specifically, quote the rate etc. in this regard. 3

4 e. Correction if any shall be made by crossing out, imitating dating and rewriting. f. The bidder shall deposit Rs in the form of bank guarantee valid for 135 days after the date of submission of bids or account payee DD/pay order drawn in favor of VVN A/C KENDRIYA VIDYALAYA SAINIK VIHAR, DELHI payable at New Delhi as earnest money along with the duly filled and properly signed bid. The earnest money shall be returned to the unsuccessful bidders after the award of the contract. g. The selected firm has to furnish performance security in the form of bank guarantee / account payee DD for an amount of Rs.50,000/- valid for fourteen months from the date of award of the contract.the performance security shall be submitted within ten days from the date of notification of award. The earnest money shall be returned only after the performance security is submitted by the contracting agency. h. Telex or facsimile bids are not acceptable. Each page of tender document must be compulsorily and properly signed by the bidder in ink. i. The bidder shall quote service charges including overhead and profit in column 7 of Annexure A in Indian rupees only and this should not be zero or derivative of zero. 2. Each bidder must submit only one bid in original format supplied or downloaded from Vidyalaya web site along with price of Tender document Rs.500 in the form of DD drawn in favor of VVN A/C KENDRIYA VIDYALAYA SAINIK VIHAR VVN payable at New Delhi (Technical bid in one sealed envelope and Commercial bid in another sealed envelope, both together sealed in a single sealed envelope superscripted as Bids for providing gardener in KV SAINIK VIHAR on service charge basis ). 3. Validity of Bid: The Bid shall remain valid for a period not less than 90 days after the deadline fixed for submission of Bids. 4. Terms and Conditions: a. The remuneration shall be disbursed through account payee cheque provided at the premises of Kendriya Vidyalaya Sainik Vihar in the presence of representative of the Kendriya Vidyalaya Sainik Vihar /its constituent or through pay advise to bank by RTGS/NEFT in the account of his deployed employees along with submission of copy of bank passbook statement of his employees as proof of payment of salary. The Contractor shall be directly responsible for the payment of wages, will include such other benefits as applicable to its employees under the relevant Acts and Regulations. The Kendriya Vidyalaya Sainik Vihar, shall not entertain any such claim of the person employed by the Contractor and shall not be liable for it. b. The contracting agency will ensure payment by the 5 th of every succeeding month to their employees through account payee cheque provided in the office/premises of Kendriya Vidyalaya Sainik Vihar or through pay advice to bank for RTGS/NEFT in the account of his deployed employees along with submission of copy of bank passbook statement, as per the monthly remuneration of contract i.e. minimum wages which should not be less than 4

5 the maximum of the two minimum wages 1. Central govt. labour commissioner rate 2. Collector rate for Distt. North West, Delhi, as declared time to time without any deduction except the statutory provisions. c. The Contracting Agency will submit the invoice/bill along with proof of disbursement in triplicate after making the payment to the employees provided to the KV Sainik Vihar Delhi office/premises supported with the following documents :- I. Details of monthly disbursement made to the staff furnishing account payee cheque details/ pay advice to bank for RTGS/NEFT in the account of his deployed employees along with copy of up-to-date bank passbook statement for each payment. II. Daily wages register properly signed by deployed employees and countersigned by representative of contractor. III. Proof of payment of statutory obligation such as EPF, ESI, and any other applicable tax. Verification of payment of EPF, ESI will be done through web-sites of EPF & ESI along with messages received on mobile phone of deployed employees before releasing payment of these statutory obligations. Payment to the contracting agency will be released within 15 days from the date of the receipt of the invoice duly completed in all respect. d. The Contracting Agency will provide Identity Card to all his employees deputed as per the format suggested by the Indenting Office valid for the period of contract. e. The Contracting Agency shall comply with all statutory obligations. Minor variations as per actual calculation will be borne by the Indenter/Client. f. It is mandatory for the Contracting Agency to submit the attested copy of valid registrations/license obtained from the authorized/competent department of Delhi/Central govt. failing which the bid will be treated as disqualified/nonresponsive. g. In case of absence on any working day, the monthly remuneration will be regulated as per the following formula: Total Monthly Remuneration = Monthly remuneration -A1 where A1 = Monthly remunerationx Nos. of days of absence Nos. of days in the month Over time rate will be in proportionate with the normal duty time hour rate as per daily wages rates. h. The Candidates/Manpower provided by the Contracting Agency shall be accepted only after scrutiny by KV Sainik Vihar, Delhi. Therefore, minimum three-four bio-data shall be made available against each slot in each category. The candidate may be invited for personal discussion also. No Conveyance or any other charges will be paid by the vidyalaya. In case, none is found suitable then additional bio-data shall be made available by the Contracting Agency, promptly i.e. within 24 hours. i. The replacement of a Candidate on account of absence /unsuitability for KV Sainik Vihar shall be made within 24 hours. Contracting agency will be penalized by Rs.100 (Rs. 5

6 Hundred only) per day per manpower in case of absence of more than one manpower on a particular day or continuous absence for more than one day by any one manpower without replacement for absence and this amount will be adjusted by the security deposit. j. The contracting agency will be required to sign a contract with the Kendriya Vidyalaya Sainik Vihar, Delhi in Rs. 100/- Non Judicial Stamp Paper as per the model contract enclosed (Annexure-B) for ready reference. The other terms and conditions specified in the bid document and accepted bid will also form the part of the model agreement. k. In case of any loss, theft / sabotage caused by/attributable to the personnel deployed, the KV Sainik Vihar reserves the right to claim and recover damages from Contracting Agency. l. The antecedents of all the workers will be got verified from the police by the Contracting Agency before deployment for work. m. The Contracting Agency will deploy the trained and sufficient SC/ST workers who are below the age of 50 years and above the age of 18 years as well as physically fit and mentally alert. The Contracting Agency will also ensure that the workers/staff deployed are free from Aid or any other infectious disease before deployment for work. n. Kendriya Vidyalaya Sainik Vihar, Delhi shall provide a small room for goods and gardening tools. No name plate of agency shall be allowed on the room and nobody from contracting agency side will be allowed to stay in the Vidyalaya campus except the staff of contracting agency on duty. o. The contracting agency shall provide its conservancy workers with impressive summer uniform as well as winter uniform with insignia. p. TDS will be deducted from monthly payment to contractor as per rules. 5. The indenter will evaluate and compare the Bids determined to be substantially responsive i.e. which are properly signed, and conform to the terms & conditions in the following manner. 6. Evaluation of bid:- Every bidder needs to submit Technical bid in one sealed envelope and Commercial bid in another sealed envelope, both together sealed in a single sealed envelope superscripted as Bids for providing housekeeping in KV Sainik Vihar, Delhi on service charge basis with following details :- 8(A). Technical bid: The bids will be treated as responsive if the following documents are attached and properly signed & submitted in the sealed envelope for bid and confirms to the terms and condition in the following manner I. Tender document in original format supplied or downloaded from Vidyalaya web site along with price of Tender document Rs.500=00 in the form of DD drawn in favor of VVN A/C KENDRIYA 6

7 VIDYALAYA SAINIK VIHAR payable at Delhi. Each page of tender document must be compulsorily and properly signed by the bidder in ink. II. Deposit of Rupees in the form of bank guaranty valid for 135 days after the date of submission of bids or account payee DD/pay order drawn in favor of KENDRIYA VIDYALAYA SAINIK VIHAR VVN A/C payable at SAINIK VIHAR, DELHI as earnest money along with the bid. III. Self attested live Establishment Registration certificates. IV. Self attested Latest copy of proof of EPF Registration. V. Self attested Latest copy of proof of ESI Registration. VI. Self attested Live Pan No. along with photocopy and currant Income tax clearance certificate. VII. Brief profile of the company and evidence to establish that the bidder has successfully executed contracts of similar nature and magnitude in the last three years (Priorities will be decided on this basis if all other conditions are same). VIII. List of clientele during last 3 years along with cost of assignment and attested copy of Experience certificates. IX. Self attested Copy of any other documents which supports the good performance of the firm. 8(B).Commercial bid:- The commercial bid will be examined only for those bidders who are technically satisfied by the Vidyalaya committee through their technical bid. The evaluation and comparison of properly signed substantially responsive bids will be done on the following basis-. I. The amounts to be quoted for providing the service(s) under various heads as per Annexure- A. However, the cost of materials, if any, should be shown separately / specifically for every bid. II. Each column of Annexure- A should be compulsorily filled.reasonable service charges should be filled compulsory in column No. 7 of Annexure A.The remuneration to the unit manpower will not be less than the maximum of the twominimum wages 1. Central govt. labour commissioner rate 2. Collector rates for DELHI [as declared time to time, applicable for Unskilled Manpower whichever is applicable as per rule. III. As per rule, for Kendriya Vidyalayas the rate applicable is the higher of the two minimum rates declared by Govt. of India Labour commissioner / Collector rate for North West, DELHI. IV. The evaluation will be done for all the items put together for annexure A. Indenter office will award the contract to the lowest evaluated responsive bidder. V. Properly signed annexure A and Annexure-III, in ink. 7. Award of Contract: a. The Indentor will award the contract to the bidder whose Bid has been determined to be substantially responsive and who has offered the lowest price as per para 7. 7

8 b. The Indentor reserves the right at the time of award of contract to increase or decrease the requirement of manpower indicated in para 2 above. c. The indentor prior to the expiration of the Bid validity period will notify the bidder whose Bid is accepted for the award of contract. The terms of the accepted offer shall be incorporated in the contract. d. Notwithstanding the above, the Indentor reserves the right to accept or reject all Bids and to cancel the biding process and reject all Bids at any time prior to the award of the contract. e. If two bidders have quoted the same lowest price then selection of bid will be done on the basis of quality of past services provided by them/experience or any other valid ground. 8. Last date and time of receipt of Bids You are requested to submit the sealed bids by Speed Post / in Tender box (Technical bid in one sealed envelope and Commercial bid in another sealed envelope, both together sealed in a single sealed envelope) in a single sealed envelope superscripted as Bids for providing Manpower &housekeeping in KV SAINIK VIHAR, DELHI on service charge basis due on date latest by 12:00 Noon at the office of the Kendriya Vidyalaya Sainik Vihar, Delhi 9. Opening of bid: - The bids will be opened by the Vidyalaya tender committee notified for this purpose in presence of bidders/authorized representatives of the bidders, if present, on at PM in the Principal Chamber of KV Sainik Vihar,Delhi. The indentor looks forward to receive the bid in the format of bid attached only and appreciate the interest of the service provider in the KV Sainik Vihar, Delhi. Yours faithfully- Signature - Name:-Leena Singh Designation: - Principal For and on behalf of the Kendriya Vidyalaya Sainik Vihar, Delhi 8

9 F. No.38/KVSV/ / द न क: ब ल स रक ष (ईएमड ): र दनद स त ज क म ल य: र. 500 स रक ष जम : र अक ट बर स 12 न म बर 2018 तक ज र स प ड प स ट द व र / दनद ब क स म ह थ -ह थ पह चन क अ दतम दतदथ 12/11/2018 पहर 12:00 बज तक क द र य द द य लय स दनक द ह र द ल ल -34 KENDRIYA VIDYALAYA SAINIK VIHAR,DELHI-34 TELEPHONE: FAX: स म, न न द दस त ज: (ख ल न न द प छत छ) (स फ-सफ ई क र य) 1. द षय: स अन ब ध क म ध यम स जन शक त (स फ-सफ ई क य) प र न करन ल स प र त क स ल न ह त ब ल (ख ल दनद प छत छ) क आम त रण क दलए दनयम ए शत और दनद स त ज क न द र य द द य लय स दनक द ह र, क द र य द द य लय स गठन द व र प रश दसत एक न गररक क ष त र क द द य लय ह क न द र य द द य लय स गठन, सम ज प ज करण अदधदनयम 1860 क तहत प ज क त, म न स स धन ए द क स म न त र लय भ रत सरक र क अध न एक क द र य प णय द त त प दषत स व यत तश स दनक य ह स गठन क द र य द द य लय क य जन क स थ न तरदणय क द र सरक र/ पररय जन ओ / रक ष कमयच ररय क बच क दशक ष प र न करन क दलए प रश दसत करत ह 2. क न द र य द द य लय स दनक द ह र द व र, ज स दक न च बत य गय ह, क य आ श ज र करन क दतदथ स एक स ल क अ दध (दजस और एक स ल क दलए भ बढ य ज सकत ह ) क दलए स अन ब ध क म ध यम स द द य लय म ब ग न क दलए जनशक त प र न करन ह त प रदतद त ए प ज क त स प र त फमय स म हरब प रदतस पध ब दलय (ख ल दनद प छत छ) क आम दत रत दकय गय ह : - 9

10 2 (क) न द य लर क क ष त र / स थ लगभग 8.5 एकड (ग र उ ड और दनम यण क ष त र) लगभग 72 कमर और 13 ट यल ट र म, म दट ग र म, गदलय र, स द य, ब ग-बग च और ख ल क ष त र क स थ-स थ सम प क र, आसप स क क ष त र भ श दमल ह स प रद त फर य क स थ द ख क सल ह द ज त ह न द य लर क पत : क द र य द द य लय स दनक द ह र द ल ल रद र,र जपदत रत अ क श,प रदतब दधत अ क श, ग र ष म,शर ए श त अ क श क छ ड कर, प र मह न, प रदत द न च र प र ष और मदहल ए स फ-सफ ई कम रद र,र जपदत रत अ क श, प रदतब दधत अ क श क छ ड कर ग र ष म,शर ए श त अ क श क ल म क ल एक प र ष तथ एक मदहल स फ-सफ ई कम प रदत द न आन क समय द द य लय क समय क अन स र परर तयदनय ह दजस आ श क म ध यम स स दचत दकय ज य ग क ल क य अ दध 8 घण ट प रदतद न प रदत जनशक त क ह ग 2.(ख) क रर स ख य ज शक त क प रक र न य तर र ग यत आ श यक स ख य 1. स फसफ ई कम -- प र ष प र थदमक म नक 4 स 5 2. स फसफ ई कम -- मदहल प र थदमक म नक 1 स 2 रद र, र जपदत रत अ क श, प रदतब दधत अ क श, ग र ष म,शर ए श त अ क श क ल क छ ड कर, प र मह न क दलए प रदत द न क ल स फ-सफ ई क रम! रद र, र जपत र छ द य और प रदतब दधत छ द य क अल, ग र ष मक ल न अ क श, शर ऋत और स क ब र क म क ल एक नर स फ-सफ ई क रम क आ श यकत ह ग आन क समय द द य लय क समय क अन स र परर तयदनय ह दजस आ श क म ध यम स स दचत दकय ज य ग क ल क य अ दध 8 घण ट प रदतद न क ह ग क ल स र म, ऑदफस र म, ल ब स, ल इब र र र म, दप र दसपल र म, ऑदफस र म, पर क ष कक ष श च लय, गदलय र इत य द क सफ ई क दलए क ल छह कमयच र और अन ब ध एज स क म क दनगर न कर ग उपलब ध कर ए गए जनशक त द व र दकए ज न ल क य क एक र पर ख दनम न न स र द स त त ह दजस स प र त द व र अपन दन शन म द द य लय क द व र बत य गय र दत स प णय कर न ह ग : - क रम स ख य जन शक त क प रक र 1 प य क षण करन क दलए अन ब ध एज स क य क दजम म र क लर आद म स वच त / प न भरन क दलए त न त श रदमक क दनगर न और क न द र य द द य लय स दनक द ह र म समग र सफ ई क खभ ल क दलए 2 सफ ई क दलए श रदमक द द य लय भ न क स फ करन क दलए जह भ उस ठ क एज स द व र दनय दकय ज त ह 10

11 2 (ग) स लग न अन लग नक-ख क अन स र सफ ई क दलए स मग र क उपय ग दकय ज न च दहए स मग र क ल गत, ह ल दक, अन ब ध एज स द व र स लग न स लग नक म ए क र द ख कर अदतरर श ल क दलय ज एग :- 2 (घ) क य दनम नदलक तखत तर क स दकय ज न ह ग : - i) दनम यण क प र क ष त र और सभ अपदशष ट स मग र क दनम यण और स ग रह क आसप स क क ष त र म क न द र य द द य लय स दनक द ह र क दन श क अन स र दनपट न ह ग ii) क य यलय ख लन स पहल स बह म एक ब र प न द व र dusters और दडटज ट क ट ण न शक आद क स थ फशय क ष त र क सफ ई और इसक ब हर 2 घ ट क अ तर ल म द श ष र प स गदलय र, स द य और ररस प शन आद ज स क ष त र म डस टर द व र झ ड -प छ करन ए फ ल ईट / ए ट -टदमयन ट उपच र क दछड क और क तक दनय त रण इत य द दनक और जब भ आ श यक ह, कमर / ग क मच र, मक त य, क ट / च ह आद स म रखन क दलए दछड क दकय ज न ह iii) द न म कम स कम 4-5 ब र दडटज ट और क ट ण न शक क उपय ग करक श च लय क सफ ई और ध ल ई ह ग iv) ठ क र द व र प र न दकए ज न ल क य म क ल नर क स थ अदधक ररय क कमर क क ल न क सफ ई क ज एग v) इस भ न म द द य लय क र क आस-प स क स म क भ तर ख ल क ष त र, सड क, म गय, ल न, सभ ग र / म दट ग ह ल / क ट न इत य द क सफ ई क ज एग vi) द द य लय क उ घ टन स पहल हर द न मकड क ज ल क हट न सदहत क य यलय फन चर (ट बल और क स ) और उपकरण, ट ल फ न, प स तक क म मल, फ इदल ग, अलम र और र ज और क तखड दकय क दनयदमत ध ल क सफ ई क ज एग vii) श च लय म अच ग ण त त क दलए स ब न और तरल स ब न क प र ध न ह ग और म त रम ग म पय यप त म त र म न फ थ ल न ब ल/ क क और ओड दनल क क रखकर, अन ब ध एज स यह स दनद त कर ग दक ऊपर दणयत ट यल टर ज इम रत म प रत य क शब दसन क प स हम श उपलब ध ह viii) आ श यक स त ओ / सफ ई स मग र क स च अन लग नक-ब क म ध यम स स लग न ह ix) स दनटर इ स ट ल शन क च दक ग ह न क दशक यत क ध य न म रखत हए 24 घ ट क भ तर w.c क ज ल, ब तल ज ल, ग ल ज ल इत य द क सफ ई/ख लन क म ज र ज न च दहए x) ज आई और स आई प इप आद म ररस क सभ दशक यत क भ 24 घ ट क भ तर दनपट र दकय ज न ह xi) सभ ड सटय क लर म प न भरन ह 11

12 xii) ग र ष म ऋत क र न सप त ह क प रत य क शदन र / आक तखर क य द स पर ड जटय क लर म क र दसन त ल ड लन, जब क लर ऑपर शन म ह और क लर क प न क ट क क सफ ई हर स ल ध ल क स थ स खन क दलए ह न ह जब उपय ग म नह ह xiii) प रत य क शदन र / सप त ह म न दलय क सफ ई और क र दसन त ल ड लन ह हर शन र क एक सप त ह र क र कर क नलए क र क स त ए i) दडटज ट द व र फशय क ष त र क ध ल ई और स क रदब ग ह न ह ii) अपन चमक क न कस न पह च ए दबन उपय सफ ई एज ट क स थ स दनटर म ल क सफ ई ह न ह iii) सफय ऑन उपय दडटज ट क उपय ग कर फशय, र ज और द भ जन स ग क हट कर दकस भ अ दछत प स ट सफ ई अ क छ ड दबन सफ ई करन आ श यक ह iv) गदलय र और स द य म भर सतह क सफ ई ह न ह v) जल भ ड रण ट क, प न क लर, र दगस त न क लर क सफ ई ह न ह vi) न म प ल ट और स ख य प ल ट (प रत य क म दजल पर) क सफ ई और अन य सभ न म प ल ट / ब ड क सफ ई ह न ह vii) दबजल क दफदट ग, र ज और क तखड क क प ख क सफ ई, ग ल स सफ ई रस यन / एज ट और द भ जन, प नदल ग आद क सफ ई, क ब ज ल क हट न सदहत ह न ह 3. उद धररत र ल य (क) क ल स लग नक 'ए' क प र र प म ब ल त उस ऐदकक (य दनट) र क उद धरण कर ग दजसम स ओ क श ल क (ल भ और प रश सदनक श ल क सदहत) श दमल ह ग स फ-सफ ई क रम ह त 01 अप र ल 2017 स ल ग क ल ऐस न य नतम मज र र स व क त क ज य ग ज द ल ल क दलय समय-समय पर घ दषत - 1. श रम आय र क द र सरक र य 2. दजल कल क टर र उत तर पद म द ल ल म स अदधकतम ह ग ईप एफ, ईएसआई ल ग दनयम न स र र स य ह ग द द य लय द व र भ गत न करन क दलए उत तर य क ई भ अन य ध दनक कर ब ल त स लग नक 'ए' म अलग स उ ध त कर ग (ख) श क षदणक स स थ न क प र न क गई स ओ क दलए स कर ल ग नह ह (ग) ओट ए क प रदत घ ट र म दसक प ररश रदमक स अदधक नह ह न च दहए 30x8 (घ) उ ध त र अन ब ध क अ दध क दलए तय क ज एग और यद स श धन दकय गय ह त ध दनक प र ध न क छ ड कर सम य जन क अध न नह दकय ज एग 12

13 ध दनक प र ध न क क रण र म परर तयन क म मल म क ल ऐस परर तयन स व क र दकए ज त ह और ल भ / स प रभ र आद क क ई अदतरर (%) दयत व नह ह ऐस म ब ल लग न क र न ब ल त क द श ष र प स, इस स ब ध म र आद क ह ल न च दहए (ङ) अगर दकस भ प रक र त र ट ह न पर उस क ट कर, ड दट ग और प नल खन क अन करण करक दकय ज एग (च) ब ल स रक ष धन (ईएमड ) क दलय ब ल त क ब ल जम / प रस त त करन क द न क स 135 द न क दलए म न य ब क ग र ट क र प म 10000=00 क न द र य द द य लय स दनक द ह र..एन. ख त क पक ष म ख त म य ब क डर फ ट(ड ड ) / भ गत न आ श " पर य ह, प णयत: भर दनद प रपत र क स थ जम करन ह ग सफल ब ल त स अन ब ध ह न क ब बक य धन असफल ब ल त ओ क पस कर द य ज एग (छ) चयदनत फमय क प र शयन स रक ष र दश (एसड ) क दलए 50000/- (12 मह न क दलए अन म दनत ल गत क ) क र दश क अन ब ध ह न क दतदथ स 14 मह न तक ध ब क ग र ट य क न द र य द द य लय स दनक द ह र..एन. ख त क पक ष म ख त म य ड ड क र प म द द य लय म जम करन ह ग सफल ब ल त द व र प र शयन स रक ष र दश, अन ब ध ह न क अदधस चन क त र ख स स द न क भ तर प रस त त करन ह ग ब ल स रक ष धन (ईएमड ) क ल अन ब ध दकय ज न ल फमय द व र प र शयन स रक ष र दश प रस त त करन क ब ल ट य ज एग (ज) ट ल क स य प रदतक दत य ई- म ल स प र दषत ब ल स व क य नह ह दनद प रपत र क प रत य क पन न पर दनद कत य क इ क स म ल हस त क षर दकय ह न अदन य ह (झ) ब ल त अन लग नक 'ए' क स त भ 7 म ओ रह ड और ल भ सदहत स श ल क अदन य र प स उ ध त कर ग और यह र दश श न य य श न य क व य त पन न नह ह न च दहय 4. प रत य क ब ल त क ब ल स रक ष धन (ईएमड ) क स थ क ल एक ब ल जम करन ह ग (तकन क और दणक त क प रत य क एक अलग स लबन द दलफ फ म ज एक बड दलफ फ म स लब ह ) ज द द य लय स दनद प रपत र क म ल य जम कर प र प त दकय गय म ल प र र प पर अथ द द य लय क ब-स ईट ड उनल ड स क शन स प र प त दकय गय दनद प र र प पर दनद प रपत र म ल य ड ड सदहत ज क न द र य द द य लय स दनक द ह र..एन. ख त क पक ष म द ल ल म य ह न च दहय 5. ब ल क धत : - ब ल क धत ब ल जम करन क अ दतम दतदथ स कम स कम 90 द न क अ दध क दलए ध रह ग 6. न र र और शत :- (क) स द क र एज स अपन कमयच ररय क प ररश रदमक क न द र य द द य लय स दनक द ह रक पररसर म द द य लय प रदतदनदध क म ज ग म र ख दकत च क क म ध यम स /आर.ट.ज.एस. / एन.इ.एफ.ट. क म ध यम 13

14 स द तररत कर ग ए अपन कमयच ररय क ब क ख त क अद यतन कर कर भ गत न क स क ष य द द य लय प रदतदनदध क प रस त त कर ग स द क र एज स अपन कमयच ररय क, श रम दनयम क अन स र, प ररश रदमक भ गत न क दलए स ध उत तर य ह ग ए ऐस अन य ल भ क श दमल कर ग, ज प र स दगक अदधदनयम और द दनयम क तहत उसक कमयच ररय क दलए उपलब ध ह सकत ह क न द र य द द य लय स दनक द ह र, स द क र एज स द व र दनय दजत व यक त क दकस भ ऐस क ग रहण नह कर ग और इसक दलए उत तर य नह ह ग (ख) स द क र एज स अन ब ध क ब क प रत य क म ह क 5 त र ख तक अपन कमयच ररय क श रम दनयम ए क न द र य द द य लय स दनक द ह र स दकए गए अन ब ध क अन स र म दसक तन क भ गत न र ख दकत च क क म ध यम स /आर.ट.ज.एस. / एन.इ.एफ.ट. क म ध यम स द तररत कर ग ए अपन कमयच ररय क ब क ख त क अद यतन कर कर भ गत न क स क ष य द द य लय प रदतदनदध क प रस त त करन स दनद त कर ग (ग) स द क र एज स अपन कमयच ररय क भ गत न करन क स क ष य ए दनम नदलक तखत स त ज क स थ समदथयत च ल न / दबल प रत य क म ह क 10 त र ख तक अदन य र प स प रस त त कर ग :- i. प रत य क भ गत न क दलए कमयच ररय क अद यतन ब क ख त प रदत क स थ र ख दकत च क क म ध यम स /आर.ट.ज.एस. / एन.इ.एफ.ट. स च क स ख य सदहत म दसक तन द तरण क द रण ii. कमयच ररय द व र हस त क षररत ड ल ज ज रदजस टर दजसक स द क र एज स क प रदतदनदध द व र प रदतहस त क षररत ह न च इय iii. ईप एफ, ईएसआई और दकस भ अन य ल ग कर क र प म स द दधक दयत व क भ गत न क प रम ण ईप एफ, ईएसआई जम ह न क सत य पन अदन य र प स स द क र एज स क कमयच ररय क म ब ईल पर प र प त हय स श ए ईप एफ, ईएसआई क बस ईट स दकय ज य ग ए उसक उपर त अन ब ध एज स क स द दधक दयत व क भ गत न दकय ज य ग स द क र एज स क भ गत न, च ल न क प र क तप त क त र ख स 15 द न क भ तर ज र दकय ज एग (घ) स द क र एज स अपन सभ कमयच ररय क द द य लय क य यलय द व र स झ ए गए प र र प ल पहच न पत र प र न कर ग ज अन ब ध क अ दध क दलए म न य ह ग (ङ) स द क र एज स सभ ध दनक दयत व क प लन कर ग स तद क गणन क अन स र लघ परर तयन क म गकत य/ क ल इ ट द व र हन दकय ज एग (च) ब ल लग ल एज स द व र नदल ल / क न द र र सरक र क अनधक त न भ ग स स दनभयत क र य स रक ष क र य क नलए प र प त ध प ज करण क प रर नणत प रनत जर कर अन र य ह न फल ह पर ब ल क अर ग य / ग र-उत तरद र र ज एग (छ) दकस भ क य द स पर स द क र एज स क कमयच ररय अन पक तस थत ह न क म मल म, म दसक प ररश रदमक दनम नदलक तखत फ म यल क अन स र द दनयदमत ह ग - क ल म दसक प ररश रदमक = म दसक प ररश रदमक - ए1 जह ए1 = [ (म दसक तन) / (मह न म द न क स ख य ) ] X अन पक तस थदत क द न ओ रट इम क भ गत न, प रदतद न मज र र क अन स र प रदत घ ट क र स रह ग 14

15 (ज) स द क र एज स द व र प र न दकए गए कमयच ररय / जनशक त क क न द र य द द य लय स दनक द ह रद व र ज च क ब ह स व क र दकए ज एग इसदलए, स द क र एज स प रत य क श र ण म प रत य क स ल ट क दलए न य नतम त न-च र ब य -ड ट उपलब ध कर य ग कमयच ररय / जनशक त क व यक त गत चच य क दलए भ आम दत रत दकय ज सकत ह इसक दलय क न द र य द द य लय स दनक द ह रद व र क ई हन य क ई अन य श ल क नह द य ज एग यद क ई भ उपय नह प य ज त ह, त 24 घ ट क भ तर अदतरर ब य ड ट स द क र एज स द व र उपलब ध कर य ज एग (झ)क न द र य द द य लय स दनक द ह र म क य स अन पक तस थदत / अन दचतत क क रण कमयच र क प रदतस थ पन क 24 घ ट क भ तर स दनद त करन ह ग दकस द न एक स अदधक अन पक तस थत कमयच र य एक स अदधक लग त र द न क दलय दकस एक कमयच र क अन पक तस थदत क प रदतस थ पन न ह न क क तस थदत म प रदत कमयच र र पय 100=00 (स र पय म त र) प रदतद न ण ड त मक श ल क स द क र एज स पर अदधर दपत दकय ज य ग दजस स द क र एज स क प र शयन स रक ष र दश (एसड ) स क ट ज य ग (ञ) स द क र एज स क क न द र य द द य लय स दनक द ह र क स थ 100 / - ग र दडदशयल स ट म प प पर पर अन ब ध करन ह ग स भय क दलए म नक अन ब ध (स लग नक- ब ) स लग न ह दनद स त ज और स व क र दकए गए ब ल म दनद यष ट अन य दनयम और शत भ म डल समझ त क दहस स ह ग (ट) दकस भ ह दन, च र गए / कदमयय द व र च र /कदमयय क क रण ह न ल च र / द ध व स क म मल म क न द र य द द य लयस दनक द ह र, स द क र एज स स ह न ल न कस न क करन और ठ क कर न क अदधक र स रदक षत रखत ह (ठ) स द क र एज स अपन सभ कमयच ररय क चररत र ए दत तय क प दलस स सत य दपत कर य ग और क म क दलए त न त स पहल म गकत य (द द य लय) क प रस त त कर ग (ड) द द य लय म स द क र एज स श र ररक र प स दफट और म नदसक र प स सतकय कम स कम 21 षय और अदधक स अदधक 50 षय क आय क कमयच ररय क त न त कर ग क य क दलए त न त स पहल स द क र एज स भ यह स दनद त कर ग दक लग य गय स फ-सफ ई क रम सभ स क र मक र ग स म ह (ढ) क न द र य द द य लय स दनक द ह र उपकरण क दलए एक छ ट कमर और स फ-सफ ई क रम क दलय आ श यक उपकरण ए स म ग र रखन ह त प र न कर ग कमर पर एज स क न म क क ई न म प ल ट नह ह ग और क य क समय म क यरत कमयच ररय क अल स द क र एज स क दकस भ कमयच र क द द य लय पररसर म रहन क अन मदत नह ह ग (ण) स द क र एज स अपन कमयच ररय क दचन ह क स थ प रभ ग र ष मक ल न क स थ-स थ सद यय क प र न कर ग (त) म दसक भ गत न स दनयम क अन स र ट ड एस कट त क ज एग 7. इ ड टर पय यप त र प स उत तर य ह न क दलए दनध यररत ब दलय क म ल य कन और त लन कर ग, ज दक सह तर क स हस त क षररत ह, और दनम नदलक तखत तर क स दनयम और शत क अन र प ह 8. ब ल क म ल य कन: - 15

16 प रत य क ब ल त दनम नदलक तखत ब य र क स थ तक क ब ल दलख एक स लब दलफ फ म तकन क ब ल और नणक त क ब ल दलख एक स लब दलफ फ म एक दणक त क ब ल जम कर ग ( न दलफ फ "क न द र र न द य लर स न क न ह रर स फ-सफ ई क रर क स प रद कर क नलए ब ल ",दलख एक स लब दलफ फ जम दकय ज य ग ): - 8 (ए) तकन क ब ल : यद ब ल क दलए तकन क ब ल दलख स लब दलफ फ म दनम नदलक तखत सह ढ ग स हस त क षर दकए स त ज स लग न ह और इन दनयम और शत क दनम नदलक तखत तर क स प दष ट करत ह त ब दलय क उत तर य म न ज एग - (क) ब ल दनद प रपत र क म ल य जम कर प र प त दकय गय म ल प र र प पर अथ द द य लय क ब-स ईट क ड उनल ड स क शन स प र प त दकय गय दनद प र र प पर दनद प रपत र म ल य क क न द र य द द य लय स दनक द ह र..एन. ख त क पक ष म य र 500/- ड ड सदहत ह न च दहय दनद प रपत र क सभ प पर ब ल त क इ क स हस त क षर ह न अदन य ह (ख) र पय = 00 क ब ल स रक ष धन (ईएमड ) ज ब ल जम / प रस त त करन क द न क स 135 द न क दलए म न य ब क ग र ट क र प म य क न द र य द द य लय स दनक द ह र..एन. ख त क पक ष म ख त म य ब क डर फ ट(ड ड ) / भ गत न आ श " ज द ल ल पर य म न य ह ग (ग) क द र य द द य लय स दनक द ह र म स रक ष ग डय क स प र न करन ह त सक षम अदधक र द व र ज र ज द त ल ईस स (आई.ज. ल ईस स) क स वप रम दणत छ य प रदत ह न च इय (घ) स वप रम दणत ज द त प रदत न प ज करण प रम णपत र ह न च इय (ङ) ईप एफ प ज करण क सब त क न नतम और स वप रम दणत प रदत ह न च इय (च) ईएसआई प ज करण क सब त क न नतम और स वप रम दणत प रदत ह न च इय (छ) ज द त प न क स वप रम ण त फ ट क प और आयकर सम ध न ह त तयम न आयकर द रण ह न च इय (ज) फमय/ एज स क स दक षप त ज नक र और यह प दष ट करन क दलए स क ष य दक ब ल लग न ल न दपछल त न ष म सम न प रक दत और पररम ण क अन ब ध क सफलत प यक दनष प द त दकय ह सलग न क ज न च इय (यद सभ अन य क तस थदतय सम न ह तब प र थदमकत ए इस आध र पर तय क ज ए ग ) (झ) ग र हक क स च क स थ दपछल त न स ल क र न इस प रक दत क दकय गय क य क ल गत और अन भ प रम ण पत र क स वप रम दणत प रदत सलग न ह न च इय (ञ) दकस अन य स त ज क प रदतदलदप ज फमय क अच प र शयन क समथयन करत ह क पय सलग न कर 8 (ब ) दणक त क ब ल : - दणक त क ब ल क पर क षण उन ब ल त ओ क दलए दकय ज एग दजनक तकन क ब ल स द द य लय सदमदत स त ष ट ह ठ क स हस त क षररत पय यप त उत तर य ब दलय क म ल य कन और त लन दनम न आध र पर दकय ज एग - 16

17 (क) स प र न करन क दलए स लग नक- "ए" क द दभन न श ष क तहत उ ध त दकए ज न ल र दश ह ल दक, स मग र क ल गत, यद क ई ह, प रत य क ब ल क दलए अलग-अलग / द दश र प स द ख य ज न च दहए (ख) स लग नक- "ए" क प रत य क स त भ क अदन य र प स भरन च दहए अन लग नक ए क स त भ स ख य 7 म उदचत स श ल क ए उपर खचय अदन य र प स भर ह न च दहए स फ-सफ ई क रम कमयच ररय क प ररश रदमक द ल ल क दलए 1. क द र सरक र श रम आय क र य 2. कल क टर क र [ज स दक समय-समय पर घ दषत स फ-सफ ई क रम कमयच ररय क दलए ल ग ह ] ज भ क न द र य द द य लय क दलय दनयम क अन स र ल ग ह क न य नतम मज र य ह ग (ग) दनयम क अन स र, क न द र य द द य लय म, द ल ल क दलय सरक र द व र घ दषत श रम आय क द र सरक र /कल क टर उत तर-पक त म द ल ल क न य नतम र म स ज भ अदधक ह, ह ल ग ह ग (घ) स लग नक- "ए" क सभ म /श ष क दलए म ल य कन दकय ज एग म गकत य क य यलय सबस कम र ल उत तर य ब ल लग न ल क अन ब ध प र न कर ग (ङ) स लग नक- "ए" और स लग नक- I पर इ क स हस त क षर दकए गय ह 9. अ ब ध क प रद ह : (क) म गकत य उस ब ल त क अन ब ध प र न कर ग दजनक ब ल उत तर य ह न दनध यररत ह और दजन ह न प र 7 (ब ) क अन स र सबस कम र क उ ध त क ह (ख) अन ब ध प र न करत समय उपर प र 2.(ख) म दनद यष ट जन शक त क आ श यकत क कम करन और ब न क दलए म ग कत य क अदधक र स रदक षत ह (ग) ब ल म न यत अ दध क सम क तप त स पहल, म ग कत य, ब ल त क ब ल क अन ब ध प र न करन क दलए स व क र दकय ज न स दचत कर ग स व क त प रस त क शत क अन ब ध म श दमल दकय म न ज एग (घ) उपर क ब ज, म ग कत य क सभ ब दलय क स व क र य अस व क र करन और ब ल प रदक रय क रद द करन और अन ब ध क प र न करन स पहल दकस भ समय सभ ब दलय क अस व क र करन क अदधक र स रदक षत रह ग 10. ब नलर क प र क तप त क अ नतर नतनथ और सर र : आपक द न क क पहर बज तक क न द र य द द य लय स दनक द ह र क क य यलय म स प ड प स ट द व र य द द य लय क दनद ब क स म (तकन क और दणक त क दलख न स ल दलफ फ एक स थ एक स लब दलफ फ म रख हय ) दनद " क न द र र न द य लर स न क न ह र र स फ-सफ ई क रर क स प रद कर क नलए ब ल ", दलख स लब दलफ फ म प रस त त करन क अन र ध दकय ज त ह 11. ब ल ख ल : - क न द र य द द य लय स दनक द ह र क प रध न च य कक ष म द द य लय दनद सदमदत,ब ल त ओ / प र दधक त प रदतदनदध यद उपक तस थत ह त ह, क उपक तस थदत म द न क क पहर बज ब दलय ख ल ग /लग ई ज एग 17

18 म गकत य, स प र त ओ द व र क न द र य द द य लय स दनक द ह र म स प र न करन क अदभर च क सर हन करत हय क ल दनद क स थ लग ए गए प र र प म ब ल प र प त करन क आश करत ह (इस दह अन म द क क तस थदत म अ ग र ज र प तरण क स व क र दकय ज य ग ) भ य- हस त क षर न म: -ल न दस ह प न म: - प रध न च य क न द र य द द य लय स दनक द ह र क दलए और क ओर स स लग नक ए Annexure A 18

19 स लग नक ए Annexure A क र. स. S.No. जनशक त क श र ण Category of Manpower ऐदकक स ख य Unit Number स फ-सफ ई स " क दलए ब ल क प र र प Format of Bid for Conservancy services Services य दनट म दसक तन (26द न) Monthly remuneration for single man power (26days) ईप एफ र % EPF rate in % ईएसआई र% ESI rate in % ऐदकक स ख य क दलय स प रभ र सदहत ओ रह ड और ल भ (क ल र. म ) Service charges including overhead and profit for unit number (in Rs. Only) स फ-सफ ई कम conservancy worker 1 ऐस न य नतम मज र र स व क त क ज य ग ज न थय स ट द ल ल क दलय समय-समय पर घ दषत 1. श रम आय र क द र सरक र य 2. दजल कल क टर र न थय स ट, द ल ल म स अदधकतम ह ग Where both central and state govt. has fixed the minimum rates of wages, the rate of wages whichever is higher will be applicable and acceptable. दनयम न स र ल ग र As per rule दनयम न स र ल ग र As per rule न ट: - Note: - 1. ब ल त स त भ 7 म उपर (ओ रह ड) और ल भ सदहत स श ल क अन र य र प स र पर म उ ध त कर ग और यह र दश श न य य श न य क व य त पन न नह ह न च दहय स त भ 7 क आध र पर कम र ल उत तर य ब ल लग न ल क अन ब ध प र न दकय ज य ग The amount in column 7 must be filled for Service charges including overhead and profit in Rs and should not be zero or derivative of zero (NIL).The contract will be awarded to the bidder whose bid has been determined to be substantially responsive and who has offered the lowest price as per column श क षदणक स स थ न क प र न क गई स ओ क दलए स कर ल ग नह ह Payment of service tax is exempted under section 93(1) of the Finance Act, 1994 (Circular No. 172/7/2013-ST Govt. of India, Ministry of Finance Dept. of Revenue Central Board of Excise & Customs Tax Research Unit order No. B1/14/2013- TRU, dated 19/09/2013.) 3. ऐस न य नतम मज र र स व क त क ज य ग ज न थय स ट द ल ल क दलय समय-समय पर घ दषत - 1. श रम आय र क द र सरक र य 2. दजल कल क टर र न थय स ट द ल ल म स अदधकतम ह ग Where both central and state government has fixed the minimum rates of wages, the rate of wages whichever is higher will be applicable and acceptable. 19

20 4. ईक ई र और क ल र म दभन नत ह न पर ईक ई र म न य ह ग In case of discrepancy between unit price and total price, the unit price shall prevail. 5. क ई स त भ ख ल य दनर क नह ह न च दहय No Columns should be left blank are filled NIL. हम उपर जनशक त स प र न करन, दनद स त ज म दनयम और शत क प लन करन और स थ ह स लग न प र र प म समझ त म श दमल ह न क दलए सहमत ह We agree to provide the above service manpower and to abide by the terms & conditions in the Tender document and also agree to enter into the agreement in the format enclosed. ब ल स रक ष (ईएमड ) र.... (र पय...) क ब क डर फ ट न बर... द न क पर य स लग न ह Bid security of Rs.... (Rupees ) is furnished herewith vide Bank Draft No dated.drawn on (दनद त Bidder) हस त क षर Signature:. न म Name:... द न क और समय Date & Time... 20

21 Conservancy Services 1. NAME OF COMPANY/FIRM : 2. ADDRESS (With Address Proof) : 3. CONTACT PERSON S NAME :- TEL. LAND LINE: MOBILE ID :- 4. PAN NO. :- (Please enclosed attested photo copy and attach copy of IT clearance certificate) 5. EPF REGISTRATION NO. : Valid up to date- (Please enclose attested photocopy) 6. EPF REGISTRATION NO. : Valid up to date (Please enclose attested photocopy) 7. ANNUAL TURNOVER FOR THE LAST 3 YEARS (Please enclose copy of documents) : : :- 8..Experience of work during the last three years along with yearly cost of assignment- (Please enclose copy of documents) i) II) iii) SIGNATURE OF TENDERER 21

22 KENDRIYA VIYDLAYA SAINIK VIHAR LIST OF HOUSE KEEPING ITEM FOR ONE MONTH स लग नक ख Annexure B S.No Name of Item Requirement/Quantity Rate 1 WHITE PHENYLE 20 LTR 2 BLACK PHENYLE 20 LTR 3 HARPIC 10 LTR 4 ACID 10 KG 5 PHOOL BROOM 12 NOS 6 TABLE DUSTER 12 NOS 7 ODONIL NET PER PC 8 FENA POWDER 8 PKT 9 FLOOR LIQUID SOAP 10 LTR 10 FLOOR DUSTER BIG 24 NOS 11 TILLA BROOM 6 NOS 12 YARD BROOM 4 NOS 13 URINAL CUBE 6 PKT 14 DUSTPAN 6 NOS 15 ROOM SPRAY GLASS 2 BOTTLE 16 DETOL LIQUID 250 ML 4 BOTTLE 17 YELLOW DUSTER 12 NOS 18 COLIN 2 NOS 19 INDO GLASS CLEANER 4 LR 20 SANI FRESH 4 NOS 21 JALA BRUSH 2 NOS 22 LIMA SOAP 8 PKT 23 BLACK BIG POLYTHENE SMALL SOAP 22 PCS TOTAL SIGNATURE OF TENDERER WITH STAMP 22

SketchBook for Galaxy

SketchBook for Galaxy SketchBook for Galaxy क प र इट और ट र डम र क SketchBook for Galaxy v.3.2 2015 Autodesk, Inc. All Rights Reserved. Except as otherwise permitted by Autodesk, Inc., this publication य parts thereof, may

More information

[TO BE PUBLISHED IN THE GAZETTE OF INDIA, EXTRA ORDINARY PART-II, SECTION 3, SUB-SECTION-(i) ]

[TO BE PUBLISHED IN THE GAZETTE OF INDIA, EXTRA ORDINARY PART-II, SECTION 3, SUB-SECTION-(i) ] [TO BE PUBLISHED IN THE GAZETTE OF INDIA, EXTRA ORDINARY PART-II, SECTION 3, SUB-SECTION-(i) ] GOVERNMENT OF INDIA MINISTRY OF FINANCE (DEPARTMENT OF REVENUE) Notification No. 9/2017-CENTRAL EXCISE (N.T.)

More information

Preparation before Registration & Making Payment

Preparation before Registration & Making Payment Preparation before Registration & Making Payment Very Important Note before buying Registering & Making Payment: Keep a valid active mobile phone number & email address which belongs to you. BPSSC shall

More information

Application Reference Letter

Application Reference Letter - Opening Dear Sir, Formal, male recipient, name unknown Dear Madam, Formal, female recipient, name unknown Dear Sir / Madam, Formal, recipient name and gender unknown Dear Sirs, Formal, when addressing

More information

Amendment of clause-2

Amendment of clause-2 Uttar Pradesh Shasan Food and Civil Supplies Section-7 In pursuance of the provision of clause (3) of Article 348 of the Constitution, the Governor is pleased to order the publication of the following

More information

Bill No. 8 of 2015 THE RAJASTHAN AGRICULTURAL PRODUCE MARKETS (AMENDMENT) BILL, 2015 (To be Introduced in the Rajasthan Legislative Assembly) A Bill

Bill No. 8 of 2015 THE RAJASTHAN AGRICULTURAL PRODUCE MARKETS (AMENDMENT) BILL, 2015 (To be Introduced in the Rajasthan Legislative Assembly) A Bill Bill No. 8 of 2015 THE RAJASTHAN AGRICULTURAL PRODUCE MARKETS (AMENDMENT) BILL, 2015 (To be Introduced in the Rajasthan Legislative Assembly) A Bill further to amend the Rajasthan Agricultural Produce

More information

GUIDELINES FOR RSBs/ ZSBs FOR PROVIDING EMPLOYMENT ASSISTANCE TO JCOs/ORs. What is the procedure to apply for employment assistance through DGR?

GUIDELINES FOR RSBs/ ZSBs FOR PROVIDING EMPLOYMENT ASSISTANCE TO JCOs/ORs. What is the procedure to apply for employment assistance through DGR? GUIDELINES FOR RSBs/ ZSBs FOR PROVIDING EMPLOYMENT ASSISTANCE TO JCOs/ORs What is the procedure to apply for employment assistance through DGR? All the vacancies received by DGR are available on the DGR

More information

Apex court does well to set the government a deadline to cure the MCI of its several ills.

Apex court does well to set the government a deadline to cure the MCI of its several ills. Just prescription Apex court does well to set the government a deadline to cure the MCI of its several ills. Tired of waiting for the government to restore to a state of health the Medical Council of India

More information

https://uidai.nseitexams.com/uidai/loginaction_input.action

https://uidai.nseitexams.com/uidai/loginaction_input.action NSEiT क ऑपर टर और स परव इजर सर ट फ क शन क ल ए न च र ए गए नन श क प न कर Kindly follow the below listed directions for Opertor/Supervisor certification through NSEiT क रम 1 - NSEiT क व ब स ईट क इस ल क स

More information

Bill No. 15 of 2014 THE CONTRACT LABOUR (REGULATION AND ABOLITION) (RAJASTHAN AMENDMENT) BILL, 2014 (To be Introduced in the Rajasthan Legislative

Bill No. 15 of 2014 THE CONTRACT LABOUR (REGULATION AND ABOLITION) (RAJASTHAN AMENDMENT) BILL, 2014 (To be Introduced in the Rajasthan Legislative Bill No. 15 of 2014 THE CONTRACT LABOUR (REGULATION AND ABOLITION) (RAJASTHAN AMENDMENT) BILL, 2014 (To be Introduced in the Rajasthan Legislative Assembly) A Bill to amend the Contract Labour (Regulation

More information

Bill No. 13 of 2011 THE RAJASTHAN AGRICULTURAL PRODUCE MARKETS (AMENDMENT) BILL, 2011 (To be Introduced in the Rajasthan Legislative Assembly) A Bill

Bill No. 13 of 2011 THE RAJASTHAN AGRICULTURAL PRODUCE MARKETS (AMENDMENT) BILL, 2011 (To be Introduced in the Rajasthan Legislative Assembly) A Bill Bill No. 13 of 2011 THE RAJASTHAN AGRICULTURAL PRODUCE MARKETS (AMENDMENT) BILL, 2011 (To be Introduced in the Rajasthan Legislative Assembly) A Bill further to amend the Rajasthan Agricultural Produce

More information

1 Bill No. 23 Of 2010 THE RAJSTHAN TENANCY (AMENDMENT) BILL, 2010 (To be Introduced in the Rajasthan Legislative Assembly) A Bill

1 Bill No. 23 Of 2010 THE RAJSTHAN TENANCY (AMENDMENT) BILL, 2010 (To be Introduced in the Rajasthan Legislative Assembly) A Bill 1 Bill No. 23 Of 2010 THE RAJSTHAN TENANCY (AMENDMENT) BILL, 2010 (To be Introduced in the Rajasthan Legislative Assembly) A Bill further to amend the Rajasthan Tenancy Act, 1955. Be it enacted by the

More information

च क त स उप रण एव अस पत ल य जन ववभ ग चचककत स उपकरण- आई एस ओ क य ग क ददश तनद श

च क त स उप रण एव अस पत ल य जन ववभ ग चचककत स उपकरण- आई एस ओ क य ग क ददश तनद श भ रत य म नक ब य र (उपभ क म मल, ख़ द एव स वजन क नवतरण म त लय,भ रत सरक र) BUREAU OF INDIAN STANDARDS (Ministry of Consumer Affairs, Food & Public distribution, Govt. of India) म नक भवन,9 बह द रश ह जफर म र

More information

Cambridge International Examinations Cambridge International General Certificate of Secondary Education

Cambridge International Examinations Cambridge International General Certificate of Secondary Education ambridge International Examinations ambridge International General ertificate of Secondary Education *0123456789* HINDI S SEOND LNGUGE 0549/02 Paper 2 Listening For Examination from 2019 SPEIMEN PPER pprox.

More information

vlk/kj.k izkf/dkj ls izdkf'kr

vlk/kj.k izkf/dkj ls izdkf'kr jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx III [k.m 4 PART III Section 4 izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 228] ubz fnyyh] c`glifrokj] twu 14] 2018@T;s"B

More information

Dictionaries द व र : स ज व भद र य स न तक त त श क षक (स गणक शवज ञ न ) क ० शव० ब ब क (लखनऊ स भ ग) स ब एसई प ठ यक रम पर आध ररत कक ष -11

Dictionaries द व र : स ज व भद र य स न तक त त श क षक (स गणक शवज ञ न ) क ० शव० ब ब क (लखनऊ स भ ग) स ब एसई प ठ यक रम पर आध ररत कक ष -11 Dictionaries स ब एसई प ठ यक रम पर आध ररत कक ष -11 द व र : स ज व भद र य स न तक त त श क षक (स गणक शवज ञ न ) क ० शव० ब ब क (लखनऊ स भ ग) पररचय Python हम collections क स गर त करन क ल ए कइ ऐस स ल ध ए प रद न

More information

vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (ii) PART II Section 3 Sub-section (ii) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY

vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (ii) PART II Section 3 Sub-section (ii) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (ii) PART II Section 3 Sub-section (ii) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 572] ubz fnyyh]

More information

vlk/kj.k izkf/dkj ls izdkf'kr अ धस चन

vlk/kj.k izkf/dkj ls izdkf'kr अ धस चन jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 897] ubz fnyyh]

More information

FAQs FOR EX-SERVICEMEN JCOs/ ORs FOR PROVIDING EMPLOYMENT ASSISTANCE TO JCOs/ORs

FAQs FOR EX-SERVICEMEN JCOs/ ORs FOR PROVIDING EMPLOYMENT ASSISTANCE TO JCOs/ORs FAQs FOR EX-SERVICEMEN JCOs/ ORs FOR PROVIDING EMPLOYMENT ASSISTANCE TO JCOs/ORs What is the procedure to apply for employment assistance through DGR? All the vacancies received by DGR are available on

More information

Institution of Safety Engineers (India) Aim to prevent Accident, Protect Environment & Minimises Losses during disaster

Institution of Safety Engineers (India) Aim to prevent Accident, Protect Environment & Minimises Losses during disaster I n dust rial s afety note s i n H i ndi, Part-I P a g e 1 Aim to prevent Accident, Protect Environment & Minimises Losses during disaster यह म न अल स र इ ज नयस स थ न (भ रत) क स प त ह स र इ ज नयस स थ न

More information

अजय अग रव ल सच व. 2- इस श सन द श कआ प रम ण कत ब स इट स सत य प तपत कआ ज सकतह ह

अजय अग रव ल सच व. 2- इस श सन द श कआ प रम ण कत ब स इट   स सत य प तपत कआ ज सकतह ह उत तर प रद श सरक र प त त त व तन शयगग अनभ ग-2 प त त त तनम न वननयम ल ए प त ध प रकगष ठ स ख य -37 /2016-0श0-2-1374/दस-2016-10/2013 लखनऊ : ददन क : 26 जभल ई, 2016 ददन क 26 जभल ई, 2016 कग प रख य प तपत उत तर प

More information

KENDRIYA VIDYALAYA SANGATHAN

KENDRIYA VIDYALAYA SANGATHAN KENDRIYA VIDYALAYA SANGATHAN HYDERABAD REGION COMMON SUMMATIVE ASSESSMENT- II CLASS: VIII MARKS: 60 SUBJECT: SOCIAL SCIENCE DURATION: 2 ½ Hrs Instructions: Question paper consists of 21 questions. All

More information

अन ल क-4 अन ल क ट क कर, सब- कर तथ हक क अ धक र एव द य व SEBI एव ट क ए सच ज र नध रत

अन ल क-4 अन ल क ट क कर, सब- कर तथ हक क अ धक र एव द य व SEBI एव ट क ए सच ज र नध रत अन ल क-4 अन ल क ट क कर, सब- कर तथ हक क अ धक र एव द य व SEBI एव ट क ए सच ज र नध रत 1. हक ए सच ज /भ रत य तभ त एव व नमय ब ड (SEBI) क नयम, उप- नयम और व नयम एव समय-समय पर ज र प रप /न टस म द गई प रभ ष क अन स

More information

vlk/kj.k izkf/dkj ls izdkf'kr

vlk/kj.k izkf/dkj ls izdkf'kr jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (ii) PART II Section 3 Sub-section (ii) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 1640] ubz fnyyh]

More information

उ तर द श श सन र ज व अन भ ग-1 स य -40/997/एक (10)/2012 लखनऊ: दन क: 14 अग त, 2014 क य लय- प

उ तर द श श सन र ज व अन भ ग-1 स य -40/997/एक (10)/2012 लखनऊ: दन क: 14 अग त, 2014 क य लय- प उ तर द श श सन र ज व अन भ ग-1 स य -40/997/एक-1-2014-9(10)/2012 लखनऊ: दन क: 14 अग त, 2014 क य लय- प व म हम न द सर वत च रट ब ल ट र म 0 उ च य य लय, इल ह ब द म स वल मस0 स य -67058/2013 व म हम न द सर वत च रट

More information

vlk/kj.k izkf/dkj ls izdkf'kr अ धस चन

vlk/kj.k izkf/dkj ls izdkf'kr अ धस चन jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 90] ubz fnyyh] lkseokj]

More information

2017 THE RAJASTHAN LEGISLATIVE ASSEMBLY (OFFICERS AND MEMBERS EMOLUMENTS AND PENSION) (AMENDMENT) BILL,

2017 THE RAJASTHAN LEGISLATIVE ASSEMBLY (OFFICERS AND MEMBERS EMOLUMENTS AND PENSION) (AMENDMENT) BILL, Bill No. 34 of 2017 THE RAJASTHAN LEGISLATIVE ASSEMBLY (OFFICERS AND MEMBERS EMOLUMENTS AND PENSION) (AMENDMENT) BILL, 2017 (To be introduced in the Rajasthan Legislative Assembly) A Bill further to amend

More information

BUREAU OF INDIAN STANDARDS (Establishment Department) OFFICE ORDER

BUREAU OF INDIAN STANDARDS (Establishment Department) OFFICE ORDER BUREAU OF INDIAN STANDARDS (Establishment Department) BIS/DGO (445)/2016 Dated: 13 June 2016 Subject: OFFICE ORDER Appointment of Authorized Medical Attendants (AMAs) under CSMA Rules and delegation of

More information

vlk/kj.k izkf/dkj ls izdkf'kr

vlk/kj.k izkf/dkj ls izdkf'kr jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 312] ubz fnyyh]

More information

Bill No. 9 of 2011 THE RAJASTHAN TENANCY (AMENDMENT) BILL, 2011 (To be Introduced in the Rajasthan Legislative Assembly) A Bill further to amend the

Bill No. 9 of 2011 THE RAJASTHAN TENANCY (AMENDMENT) BILL, 2011 (To be Introduced in the Rajasthan Legislative Assembly) A Bill further to amend the Bill No. 9 of 2011 THE RAJASTHAN TENANCY (AMENDMENT) BILL, 2011 (To be Introduced in the Rajasthan Legislative Assembly) A Bill further to amend the Rajasthan Tenancy Act, 1955. Be it enacted by the Rajasthan

More information

9 Uncorrected/ Not for Publication

9 Uncorrected/ Not for Publication 9 Q. NO. 361 र शद अ व : सर, सरक र न ज जव ब दय ह और उसम व डर ब क क ज प वट र ल इन ह, according to the poverty line of the World Bank, it is 1.25 dollars per day, which comes to near about Rs. 60 per day.

More information

Sone Ki Chidiya Federation New Delhi Annual Report

Sone Ki Chidiya Federation New Delhi Annual Report Sone Ki Chidiya Federation New Delhi Annual Report 2016-17 http://sonekichidiya.in/ info@sonekichidiya.in Contents 1. THE ORGANISATION, ITS STRUCTURE AND SYSTEMS... 5 1.1. Establishment as a Trust... 5

More information

न य नतम स झ क यक रम सम च र पत र क CMP E-NEWSLETTER BE A GOOD PERSON BUT DON T WASTE TIME TO PROVE IT!

न य नतम स झ क यक रम सम च र पत र क CMP E-NEWSLETTER BE A GOOD PERSON BUT DON T WASTE TIME TO PROVE IT! Website: - www.kv1chandimandir.org E-Mail id: - kvchandimandir1@gmail.com न य नतम स झ क यक रम सम च र पत र क CMP E-NEWSLETTER 2017-18 BE A GOOD PERSON BUT DON T WASTE TIME TO PROVE IT! WORDS OF ENCOURAGEMENT

More information

Series: 02 TEACHING APTITUED

Series: 02 TEACHING APTITUED Series: 02 TEACHING APTITUED 1. The effect of fear and punishment can make the 6. If a student does not work honestly then you? children uninspired, by this statement you? (A) Honor students will be embarrassed

More information

600 THE GAZETTE OF INDIA : MARCH 24, 2018/CHAITRA 3, 1940 [PART II SEC. 3(i)]

600 THE GAZETTE OF INDIA : MARCH 24, 2018/CHAITRA 3, 1940 [PART II SEC. 3(i)] 600 THE GAZETTE OF INDIA : MARCH 24, 2018/CHAITRA 3, 1940 [PART II SEC. 3(i)] Whether age and educational qualification prescribed for direct recruits will apply in case of promotees Period probation,

More information

The Rajasthan State Highways Act, 2014

The Rajasthan State Highways Act, 2014 The Rajasthan State Highways Act, 2014 Act 22 of 2015 Keyword(s): State Highway, Competent Authority, Collector, Control Zone, Concession, Concessionaire, Encroachment, Divisional Commissioner,Excavation,

More information

vlk/kj.k izkf/dkj ls izdkf'kr

vlk/kj.k izkf/dkj ls izdkf'kr jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 508] ubz fnyyh]

More information

vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY

vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 822 GI/2014 (1) vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m PART II Section 3 Sub-section izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 86] ubz

More information

6 BACHELOR OF COMMERCE (B.COM.)(CBSGS)(75:25)SEM VI / C0185 FINANCIAL ACCOUNTING & AUDITING : PAPER X AUDITI. [Time: Hours ] [Marks: 75 ]

6 BACHELOR OF COMMERCE (B.COM.)(CBSGS)(75:25)SEM VI / C0185 FINANCIAL ACCOUNTING & AUDITING : PAPER X AUDITI. [Time: Hours ] [Marks: 75 ] N.B: [Time: 2 1 2 Hours ] [Marks: 75 ] Please check whether you have got the right question paper. 1. All questions are compulsory. 2. Question No.2 to 5 have internal options. 3. Figures to the right

More information

Have you heard of the Four Spiritual Laws?

Have you heard of the Four Spiritual Laws? Have you heard of the Four piritual Laws? य आप च र आ य मक नयम ज नत ह? Just as there are physical laws that govern the physical universe, so are there spiritual laws which govern your relationship with

More information

vlk/kj.k izkf/dkj ls izdkf'kr व म लय अ धस चन

vlk/kj.k izkf/dkj ls izdkf'kr व म लय अ धस चन jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 794] ubz fnyyh]

More information

vlk/kj.k izkf/dkj ls izdkf'kr

vlk/kj.k izkf/dkj ls izdkf'kr jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx I [k.m 1 PART I Section 1 izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 170] ubz fnyyh] cq/okj] ebz 9] 2018@ os'kk[k 19]

More information

Direction (1-10): SPAWN spawn oppression OPPRESSION predates endeavour

Direction (1-10):  SPAWN spawn oppression OPPRESSION predates endeavour 1 Direction (1-10): Read the passage carefully and answer the question that follow. Certain words are printed in bold to help you locate them while answering some of the question: Technology can be most

More information

read me Caution: Before using your phone, please read the safety, regulatory and legal information provided with your product.

read me Caution: Before using your phone, please read the safety, regulatory and legal information provided with your product. en-gb read me Caution: Before using your phone, please read the safety, regulatory and legal information provided with your product. Moto E4 Plus_GSG_India Country Group_en-GB hi_ssc8c18363a.indb 4/7/2017

More information

The National Bank for Agriculture and Rural Development (NABARD) Madhya Pradesh Regional Office, Bhopal

The National Bank for Agriculture and Rural Development (NABARD) Madhya Pradesh Regional Office, Bhopal The National Bank for Agriculture and Rural Development (NABARD) Madhya Pradesh Regional Office, Bhopal Empanelment of contractors/suppliers/vendors for maintenance and repair works, security, housekeeping,

More information

vlk/kj.k izkf/dkj ls izdkf'kr अ धस चन प अ धस चन

vlk/kj.k izkf/dkj ls izdkf'kr अ धस चन प अ धस चन jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (ii) PART II Section 3 Sub-section (ii) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 217] ubz fnyyh]

More information

vlk/kj.k Hkkx II [k.m 3 mi&[k.m (i) izkf/dkj ls izdkf'kr

vlk/kj.k Hkkx II [k.m 3 mi&[k.m (i) izkf/dkj ls izdkf'kr jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 194] ubz fnyyh]

More information

committeee member Pritam

committeee member Pritam 1 Date: 23-07-18 There is no shortcut to Eminence V Ranganathan, (The writer is former professor, IIM-Bangalore) No Indian university or institute has come in the top 100 of world university rankings.

More information

Madhya Pradesh WAREHOUSE STORAGE MODULE

Madhya Pradesh WAREHOUSE STORAGE MODULE User manual for Madhya Pradesh WAREHOUSE STORAGE MODULE A software developed under the project Extension of IISFM to DCP States Food and Consumer Affairs Infosys Division National Informatics Centre Department

More information

read me Caution: before using your phone, please read the safety, regulatory and legal information provided with your product.

read me Caution: before using your phone, please read the safety, regulatory and legal information provided with your product. en-gb read me Caution: before using your phone, please read the safety, regulatory and legal information provided with your product. Different is better Moto G5+_GSG_India Country Group_en-GB hi_68018290016a.indb

More information

PROCUREMENT PROCEDURE OF CPRI (NON - WORKS)

PROCUREMENT PROCEDURE OF CPRI (NON - WORKS) 5.07.017 30.06.0 1 OF 13 FORMAT FOR -TENDER - SINGLE BID SYSTEM CPRIBLR18 NIT06 e-tender DOCUMENT SINGLE BID SYSTEM Name Of The Purchaser Director General, Central Power Research Institute, Bengaluru.

More information

Sami direct health and wealth plan presentation manual

Sami direct health and wealth plan presentation manual Sami direct health and wealth plan presentation manual आज हम र सम ज द बड समस य ओ स प ड़ त ह 1.बबग त ह ई स हत और 2.आर थ क त ग sami direct एक ऐस pletform ह जह आप और आपक पररव र अच छ स हत प सकत ह और द सर ओर

More information

SL. NO. PROPERTY UNIT TEST METHOD VALUE. 1 Molecular Weight Mn GPC deg C Cst ASTM D

SL. NO. PROPERTY UNIT TEST METHOD VALUE. 1 Molecular Weight Mn GPC deg C Cst ASTM D SBU : GREASES & LUBRICANTS P-43 HIDE ROAD EXTENSION KOLKATA 700088 PHONE NO. 033-24505-300 FAX NO. 033-2439-5160 / 2277 E-mail:ghatak.a@balmerlawrie.com Enquiry No: GLK/TE16/424 Date: 30.03.17 TENDER ENQUIRY

More information

क स जल य रख अपन अन दर क च ग र क. Chetan Bhagat

क स जल य रख अपन अन दर क च ग र क. Chetan Bhagat क स जल य रख अपन अन दर क च ग र क Chetan Bhagat Good Morning everyone, म झ यह ब लन क म क द न क ललए आप सभ क धन यव द. य लदन आपक ब र म ह. आप, ज लक अपन घर क आर म और क छ cases म लदक कत क छ ड क इस college म आए

More information

REMAL PUBLIC SCHOOL. Class II ( ) ENGLISH UNIT- 4

REMAL PUBLIC SCHOOL. Class II ( ) ENGLISH UNIT- 4 Class II (2018 2019) ENGLISH UNIT- 4 Course Book: Chapter- 9 Bhoomi new words, finger reading practice, compound words, words related to space, question answers. Chapter- 12 If I Were Poem recitation.

More information

Kundali Astrological Report for Akash

Kundali Astrological Report for Akash Astrological Report for Akash Report from: mpanchang.com 32 Gopal Tower, Gopal Bari, Jaipur 302001 Page 1 Introduction ज य त ष एक प र च न एक नप ह आ समय ह ह ल कक ज य त ष क कई अलग-अलग द ष ट क ण ह, सभ ज य

More information

CPRIBLR18MTD14C268 Automatic Bomb Calorimeter

CPRIBLR18MTD14C268 Automatic Bomb Calorimeter PROCUREMENT PROCEDURE OF CPRI (NON - WORKS) Revision No 03 Issue No. 2 Dt of Revision 25.07.2017 Issue Dt. 30.06.2003 Issue by PA Page No. 1 OF 13 Section Formats Document PPM Topic FORMAT FOR -TENDER

More information

vlk/kj.k Hkkx II [k.m 3 mi&[k.m (i) izkf/dkj ls izdkf'kr

vlk/kj.k Hkkx II [k.m 3 mi&[k.m (i) izkf/dkj ls izdkf'kr jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 609] ubz fnyyh]

More information

vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (ii) PART II Section 3 Sub-section (ii) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY

vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (ii) PART II Section 3 Sub-section (ii) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (ii) PART II Section 3 Sub-section (ii) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 640] ubz fnyyh]

More information

Q.2 A) Write a detail note on effective solid waste management. 10 B) Discuss various effects of hazardous waste on environment and health.

Q.2 A) Write a detail note on effective solid waste management. 10 B) Discuss various effects of hazardous waste on environment and health. N.B: [Time: Three Hours] Please check whether you have got the right question paper. 1. All questions are compulsory. 2. Draw diagrams / maps wherever necessary. 3. Figures to the right indicate marks

More information

vlk/kj.k izkf/dkj ls izdkf'kr

vlk/kj.k izkf/dkj ls izdkf'kr jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m PART II Section 3 Sub-section izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 2752] ubz fnyyh] c`glifrokj]

More information

vadsf{kr ys[kk Audited Accounts

vadsf{kr ys[kk Audited Accounts vadsf{kr ys[kk Audited Accounts 2013-2014 क द र य श त र य त मऴ स थ न CENTRAL INSTITUTE OF CLASSICAL TAMIL (Lok;Rr lalfkku] ekuo lalkk/ku fodkl ea=ky;] mpprj f k{kk fohkkx] Hkk"kk izhkkx] Hkkjr ljdkj) (An

More information

Don t Torture The Dying

Don t Torture The Dying 1 Date: 20-06-16 Don t Torture The Dying Health ministry s draft law confuses between euthanasia and withdrawal of life support The Constitution of India guarantees life with dignity as a fundamental right.

More information

उपय ग त य प क रमज न और म न सक व य क दव इय

उपय ग त य प क रमज न और म न सक व य क दव इय Handy fact sheet: Ramadan and mental health medicines उपय ग तय पक रमज न और म न सक व य क दव इय Hindi रमज न कब ह? वष दर वष रमज न क महन क स र वष त रख अलग-अलग ह त ह और स थ ह आप कह अवथत ह उस पर नभर करत ह ए

More information

vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY

vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY (1) jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 66] ubz fnyyh]

More information

अपन स म र टफ न ह त स रक ष और उत प द ज नक र. 4G LTE BlackBerry PlayBook tablet (LTE/ HSPA+)

अपन स म र टफ न ह त स रक ष और उत प द ज नक र. 4G LTE BlackBerry PlayBook tablet (LTE/ HSPA+) अपन स म र टफ न ह त स रक ष और उत प द ज नक र 4G LTE BlackBerry PlayBook tablet (LTE/ HSPA+) %"$!)'!#'%+!"%*)!-&")%*"%*"&!*"*%"%*")&%*"")&%&&!$&')!1 MAT-45531-050 MAT-45531-050 PRINTSPEC-021 SWD-1697586-0615082539-050

More information

vlk/kj.k izkf/dkj ls izdkf'kr अ धस चन

vlk/kj.k izkf/dkj ls izdkf'kr अ धस चन jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (ii) PART II Section 3 Sub-section (ii) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 3156] ubz fnyyh]

More information

No. A-12026/1/2016-Estt. I

No. A-12026/1/2016-Estt. I No. A-12026/1/2016-Estt. I भ रत सरक र कर मच र चयन आय ग क र र मक तथ प रर क षण व भ ग क र र मक, ल क र क यत तथ प न र त र लय ब लमक स.12 क न द र य क य मलय प रसर, ल ध र ड Government of India Staff Selection Commission

More information

They don t really care about us

They don t really care about us 1 Date: 06-04-18 They don t really care about us Our politicians have mastered the art of electioneering untied to performance or public welfare Rishi Sethi, [The writer runs a PR and marketing startup]

More information

म वभ ग क स व ओ क लए आव दन क स ब ध म नद शक

म वभ ग क स व ओ क लए आव दन क स ब ध म नद शक LABOUR DEPARTMENT MANAGEMENT SYSTEM END USER GUIDE म वभ ग क स व ओ क लए आव दन क स ब ध म नद शक 1 TABLE OF CONTENTS Contents END USER GUIDE... 1 INTRODUCTION... 3 ABOUT THIS DOCUMENT... 4 INTENDED AUDIENCE...

More information

MASTER QUESTION PAPER WITH KEY

MASTER QUESTION PAPER WITH KEY 1. न च दए गए म, न द वक प म स स ब धत श द क चयन कर ड टर : नस ::? : अन य य. कम. नय. कम च र. न त 2. क नस स य, न च दए स ब ध क सव म ढ ग स प ण कर ग? 42 : 20 :: 64 :?. 31. 33. 35. 36 3. अस गत क च न. रय. श त रम

More information

स र दर णक: प र ण स र णग रहर उपर ग क ल ए न द र स मव र, 21 अगस त Agreement v1.4 Mar Eclipse2017.org, inc. Eclipse2017.org, inc.

स र दर णक: प र ण स र णग रहर उपर ग क ल ए न द र स मव र, 21 अगस त Agreement v1.4 Mar Eclipse2017.org, inc. Eclipse2017.org, inc. स र दर णक: उपर ग क ल ए न द र प र ण स र णग रहर स मव र, 21 अगस त 2017 Agreement v1.4 Mar 2014 2014-2017 2014-2017 TERMS AND CONDITIONS FOR USE OF SOLAR VIEWER Please read these Instructions for Use carefully

More information

DAV PUBLIC SCHOOL,ASHOK VIHAR,PH-IV,DELHI SESSION

DAV PUBLIC SCHOOL,ASHOK VIHAR,PH-IV,DELHI SESSION DAV PUBLIC SCHOOL,ASHOK VIHAR,PH-IV,DELHI-110052 SESSION 2018-19 ENGLISH SYLLABUS UNIT TEST 1 HALF YEARLY UNIT TEST 2 FINALS 20 MARKS 80 MARKS 20 MARKS 80 MARKS Monday Morning Blues Tale of a Tail Five

More information

vlk/kj.k izkf/dkj ls izdkf'kr अ धस चन

vlk/kj.k izkf/dkj ls izdkf'kr अ धस चन jftlvªh laö Mhö,yö&33004@99 REGD. No. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 375] ubz fnyyh]

More information

Direction (1-10): contemplate jagged thriving burgeoning

Direction (1-10): contemplate jagged thriving burgeoning 1 Direction (1-10): Read the following passage carefully and answer the questions that follow. Certain words/phrases are printed in bold to help you locate them while answering some of the questions. The

More information

GURU HARKRISHAN PUBLIC SCHOOL VASANT VIHAR NEW DELHI HOLIDAYS HOME WORK CLASS-III ENGLISH

GURU HARKRISHAN PUBLIC SCHOOL VASANT VIHAR NEW DELHI HOLIDAYS HOME WORK CLASS-III ENGLISH GURU HARKRISHAN PUBLIC SCHOOL VASANT VIHAR NEW DELHI HOLIDAYS HOME WORK - 2018-19 CLASS-III ENGLISH 1. Visit any one of the following places with your family: a) Zoo b) Any monument c) Children s Park

More information

read me Caution: before using your phone, please read the safety, regulatory and legal information provided with your product.

read me Caution: before using your phone, please read the safety, regulatory and legal information provided with your product. en-gb read me Caution: before using your phone, please read the safety, regulatory and legal information provided with your product. Moto Z2 Play_GSG_India Country Group_en-GB hi_68018315009a.indb 23-03-2017

More information

Sector. Arm. Date: be about winning. 10% of the. tried. this sector have. visions for. industrialisation.

Sector. Arm.   Date: be about winning. 10% of the. tried. this sector have. visions for. industrialisation. 1 Date: 02-01-19 Arm the Farming Sector Abheek Barua,,(The writer is chief economist, HDFC Bank.) If good politics is as it, perhaps, should be about winning elections, it might be eminently sensible at

More information

vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (ii) PART II Section 3 Sub-section (ii) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY

vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (ii) PART II Section 3 Sub-section (ii) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 2684] ubz fnyyh] jfookj] uoecj 13] 2016@dkfrZd 22] 1938 No. 2684] NEW DELHI, SUNDAY, NOVEMBER 13, 2016/KARTIKA 22, 1938 नई द ल, 13 नव बर, 2016 क.आ. 3447(अ). भ रत सरक र,, आ थक क य वभ ग क अ धस चन स.

More information

अख ल भ रत य व क श रवण स स थ न, म स र ALL INDIA INSTITUITE OF SPEECH AND HEARING, MYSURU

अख ल भ रत य व क श रवण स स थ न, म स र ALL INDIA INSTITUITE OF SPEECH AND HEARING, MYSURU अख ल भ रत य व क श रवण स स थ न, म स र 570 006 ALL INDIA INSTITUITE OF SPEECH AND HEARING, MYSURU-570 006 उत क ष टत क द र क भवन क ललए ड ट लल क स ववध क ल ए ई-प र प त क अध स चन E-procurement Notification for

More information

CONSTITUTION OF INDIA

CONSTITUTION OF INDIA By RAKESH SAO WWW.PSCACADEMY.IN - GOL CHOCK, NEAR NIT Page 1 भ ग 3 : म ल क अल क र म ल क अल क र म ल क अल क र क इल ह स म ल क अल क र क ल भ जन महत पर ण स ल न स श न म ल क अल क र स सम ब ल अन च छ द - GOL CHOCK,

More information

BALMER LAWRIE & CO LTD (A Government of India Enterprise) SBU : Greases & Lubricants P-43 Hide Road Extension Kolkata NOTICE INVITING TENDER

BALMER LAWRIE & CO LTD (A Government of India Enterprise) SBU : Greases & Lubricants P-43 Hide Road Extension Kolkata NOTICE INVITING TENDER BALMER LAWRIE & CO LTD (A Government of India Enterprise) SBU : Greases & Lubricants P-43 Hide Road Extension Kolkata - 700 088 NOTICE INVITING TENDER 1. Tender No. : GLK/TE17/058, dated may 29 th,2017

More information

vlk/kj.k EXTRAORDINARY PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY

vlk/kj.k EXTRAORDINARY PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 188] ubz fnyyh]

More information

vlk/kj.k izkf/dkj ls izdkf'kr क ष एव कस न क य ण ण म लय अ धस चन

vlk/kj.k izkf/dkj ls izdkf'kr क ष एव कस न क य ण ण म लय अ धस चन jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 943] ubz fnyyh]

More information

ISA Cardiopulmonary Resuscitation (CPR) Guidelines 2017

ISA Cardiopulmonary Resuscitation (CPR) Guidelines 2017 ISA Cardiopulmonary Resuscitation (CPR) Guidelines 2017 Acknowledgment We sincerely thank and acknowledge the contribution of all the member professional societies and members of Team Resuscitation for

More information

र ज थ न व वध यक, 2015 (ज स क र ज थ न वध न सभ म प र: थ पत कय ज य ग )

र ज थ न व वध यक, 2015 (ज स क र ज थ न वध न सभ म प र: थ पत कय ज य ग ) र ज थ न व वध यक, 2015 2015 क वध यक स. 6 (ज स क र ज थ न वध न सभ म प र: थ पत कय ज य ग ) व य वष 2015-16 क लए र य सरक र क व य त व क भ व करन क लए र ज थ न म य प रव धत कर अ ध नयम, 2003, र ज थ न थ न य म म ल क

More information

To purchase Online Test Series & Video Courses, visit: store.adda247.com If you have any query, mail us at:

To purchase Online Test Series & Video Courses, visit: store.adda247.com If you have any query, mail us at: 1 To purchase Online Test Series & Video Courses, visit: store.adda247.com Directions (1-5): Study the following information carefully and answer the questions given below. Five projects P, Q, R, S and

More information

2 क़ दरत ख त ख त च पट कज भ र, दख घ र अ ध र र म त ह ख त ह ण ल गर, य न कड़ स त र र बन ख द और बन दव ई, ज गल ख ब खड़ थ र, ह रय ल थ घण गजब क, प ड़ त प ड़ अड़ थ र

2 क़ दरत ख त ख त च पट कज भ र, दख घ र अ ध र र म त ह ख त ह ण ल गर, य न कड़ स त र र बन ख द और बन दव ई, ज गल ख ब खड़ थ र, ह रय ल थ घण गजब क, प ड़ त प ड़ अड़ थ र 2 क़ दरत ख त ख त च पट कज भ र, दख घ र अ ध र र म त ह ख त ह ण ल गर, य न कड़ स त र र बन ख द और बन दव ई, ज गल ख ब खड़ थ र, ह रय ल थ घण गजब क, प ड़ त प ड़ अड़ थ र, सब ज व क स झ थ, न पहर कत कड़ थ र, ओज़ न परत भ स बत

More information

र ज थ न वध न सभ क क य व ह क व त त अ क 3 त रहव वध न सभ क त त य स क ब वनव दवस स य 17 ग व र, 27 अग त, 2009

र ज थ न वध न सभ क क य व ह क व त त अ क 3 त रहव वध न सभ क त त य स क ब वनव दवस स य 17 ग व र, 27 अग त, 2009 lpm/akt/1100/1a/27.08.09 अश धत त/ क शन थ नह अ क 3 त रहव वध न सभ क त त य स क ब वनव दवस स य 17 ग व र, 27 अग त, 2009 र ज थ न वध न सभ क ब ठक 1100 बज वध न सभ भवन, जयप र म र भ ह ई ( द प स ह श ख वत, अ य, पद स

More information

MAHANADI COALFIELDS LIMITED

MAHANADI COALFIELDS LIMITED MAHANADI COALFIELDS LIMITED (A Subsidiary of Coal India Ltd ) Office of the General Manager (A/MP&R) Jagriti Vihar,Sambalpur, Burla, 768020 Ref. No. MCL/MP&R/Recruitment/ 2014/166 Date: 19/02/2014 EMPLOYMENT

More information

CTR Mess Catering Contract. Ref. No. CTR/LDH/Hostel-Tender/ , dated

CTR Mess Catering Contract. Ref. No. CTR/LDH/Hostel-Tender/ , dated E-TENDER DOCUMENT CTR Mess Catering Contract Ref. No. CTR/LDH/Hostel-Tender/2018-19, dated 05.12.2018 Central Tool Room, A-5, Phase-V, Focal Point, Ludhiana-141010 Phone No. 0161-2670057-59 Fax No. 0161-2674746

More information

People live, love, marry, divorce, make choices. Decriminalising adultery is the necessary choice

People live, love, marry, divorce, make choices. Decriminalising adultery is the necessary choice 1 Date: 16-07-18 Keep Off Bedrooms People live, love, marry, divorce, make choices. Decriminalising adultery is the necessary choice TOI Editorial Government s opposition to decriminalising adultery because

More information

Disc.CD No.497, dated at Mangaldei, (Assam)

Disc.CD No.497, dated at Mangaldei, (Assam) व त ल प न.497, म गलद ई (अ स म), दन क 22.01.08 Disc.CD No.497, dated 22.01.08 at Mangaldei, (Assam) समय 00.05-00.58 ज स - ब ब ब धम म ज स डफ दर 3-4 (स ) स ल ब द ज म ल त ह, म स म न धम म भ स म ह य? ब ब - जब

More information

BUREAU OF ENERGY EFFICIENCY. LED lamps. Notification/ Regulation/ Amendment & Date

BUREAU OF ENERGY EFFICIENCY. LED lamps. Notification/ Regulation/ Amendment & Date BUREAU OF ENERGY EFFICIENCY LED lamps Short Title LED lamps Clause of EC Act, 2001 14(b) 14(a) 14(d) Notification/ Regulation/ Amendment & Date S.O. 4096 (E) dated 28 th December, 2017 S.O.4097 (E) dated

More information

vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (ii) PART II Section 3 Sub-section (ii) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY

vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (ii) PART II Section 3 Sub-section (ii) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (ii) PART II Section 3 Sub-section (ii) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 427] ubz fnyyh]

More information

vlk/kj.k Hkkx III [k.m 4 izkf/dkj ls izdkf'kr अ धस चन

vlk/kj.k Hkkx III [k.m 4 izkf/dkj ls izdkf'kr अ धस चन jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx III [k.m 4 PART III Section 4 izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 408] ubz fnyyh] c`glifrokj] uoecj 1] 2018@dk

More information

read me Caution: before using your phone, please read the safety, regulatory and legal information provided with your product.

read me Caution: before using your phone, please read the safety, regulatory and legal information provided with your product. en-gb read me Caution: before using your phone, please read the safety, regulatory and legal information provided with your product. Moto C Plus_GSG_India Country Group_en-GB hi_ssc8c17694a.indb 24-03-2017

More information

vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY

vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY jftlvªh laö Mhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY Hkkx II [k.m 3 mi&[k.m (i) PART II Section 3 Sub-section (i) izkf/dkj ls izdkf'kr PUBLISHED BY AUTHORITY la- 117] ubz fnyyh]

More information

आय.ट. व व अ ड ब फ ट श प CS3 करण प ट ल

आय.ट. व व अ ड ब फ ट श प CS3 करण प ट ल www.itvishwa.com आय.ट. व व अ ड ब फ ट श प CS3 करण प ट ल आय.ट. व व PHOTOSHOP CS3 A. Introduction to Photoshop Adobe क पन च Photoshop ह एक स टव अर आह. य त फ ट म य फ रफ र करत य त त, तस च द न फ ट च म स ग करत

More information

vlk/kj.k EXTRAORDINARY HkkxII [k.m 3 mi&[k.m(i) PART II Section 3 Sub-section (i) izkf/dkjlsizdkf'kr PUBLISHEDBYAUTHORITY

vlk/kj.k EXTRAORDINARY HkkxII [k.m 3 mi&[k.m(i) PART II Section 3 Sub-section (i) izkf/dkjlsizdkf'kr PUBLISHEDBYAUTHORITY jftlvªhlaömhö,yö&33004@99 REGD. NO. D. L.-33004/99 vlk/kj.k EXTRAORDINARY HkkxII [k.m 3 mi&[k.m(i) PART II Section 3 Sub-section (i) izkf/dkjlsizdkf'kr PUBLISHEDBYAUTHORITY la- 693] ubz fnyyh] 'kqøokj]

More information