PROGRESSING WITH HERITAGE : DESIGN IN THE CONTEXT OF HERITAGE Brittany House : A Fusion of Contemporary Living in Heritage Charm Oasis Hotel : The Salad Bowl Project Preserving St. Joseph : A technical feat A grooming tale of two Buildings; BMW & Penang Plaza
BRITTANY HOUSE - A FUSION OF CONTEMPORARY LIVING IN HERITAGE CHARM
Buffer Zone Core Area LOCATION & SITE CHALLENGES & NGO
Kuala Lumpur Indonesia Singapore BRITTANY HOUSE FLOOR PLANS
Kuala Lumpur Indonesia Singapore BRITTANY HOUSE FLOOR PLANS
Kuala Lumpur Indonesia Singapore BRITTANY HOUSE DESIGN APPROACH
Kuala Lumpur Indonesia Singapore BRITTANY HOUSE BEFORE & AFTER
Kuala Lumpur Indonesia Singapore
Kuala Lumpur Indonesia Singapore BRITTANY HOUSE IN THE MAKING
Kuala Lumpur Indonesia Singapore BRITTANY HOUSE BEFORE & AFTER
BRITTANY HOUSE BEFORE & AFTER Kuala Lumpur Indonesia Singapore
Kuala Lumpur Kuala Lumpur Indonesia Singapore BRITTANY HOUSE BEFORE & AFTER
Kuala Lumpur Indonesia Singapore BRITTANY HOUSE BEFORE & AFTER
Kuala Lumpur Indonesia Singapore BRITTANY HOUSE BEFORE & AFTER
Kuala Lumpur Indonesia Singapore
BRITTANY HOUSE BEFORE & AFTER Kuala Lumpur Indonesia Singapore
Kuala Lumpur Indonesia Singapore
Kuala Lumpur Indonesia Singapore BRITTANY HOUSE IN THE MAKING
Kuala Lumpur Indonesia Singapore
Kuala Lumpur Indonesia Singapore
Kuala Lumpur Indonesia Singapore BRITTANY HOUSE BEFORE & AFTER
Kuala Lumpur Indonesia Singapore BRITTANY HOUSE BEFORE & AFTER
Kuala Lumpur Indonesia Singapore
Kuala Lumpur Indonesia Singapore
OASIS HOTEL THE SALAD BOWL PROJECT
SITE LOCATION 23 Love Lane Conservation & Restoration by BYG
LEGEND Anglo Indian Bungalow Chinese Indian Terrace Straits Eclectic Annex Indian Shophouse facing Steward Lane 1920s Jack Roof Annex facing Steward Lane Chinese Gate EXISTING SITE PLAN 23 Love Lane Conservation & Restoration by BYG
Anglo Indian Bungalow
Straits Eclectic Annex
Chinese Indian Terrace
1920s Jack Roof Annex facing Steward Lane
Indian Shophouse facing Steward Lane
Chinese Gate
PROPOSED LEVEL 1 FLOOR PLAN 23 Love Lane Conservation & Restoration by BYG
PROPOSED LEVEL 2 FLOOR PLAN 23 Love Lane Conservation & Restoration by BYG
THE CHINESE GATE-RESTORATION IN PROGRESS 23 Love Lane Conservation & Restoration by BYG
THE ANGLO INDIAN BUNGALOW-RESTORATION IN PROGRESS 23 Love Lane Conservation & Restoration by BYG
THE ANGLO INDIAN BUNGALOW-RESTORATION IN PROGRESS 23 Love Lane Conservation & Restoration by BYG
THE CHINESE INDIAN TERRACE- RESTORATION IN PROGRESS 23 Love Lane Conservation & Restoration by BYG
THE STRAITS ECLECTIC ANNEX 23 Love Lane Conservation & Restoration by BYG
THE 1920s JACK ROOF ANNEX 23 Love Lane Conservation & Restoration by BYG
THE INDIAN SHOPHOUSE 23 Love Lane Conservation & Restoration by BYG
PRESERVING ST. JOSEPH NOVITIATE - A TECHNICAL FEAT
St. Joseph Novitiate GURNEY PARAGON PROJECT SITE SITE LOCATION St. Joseph Novitiate Conservation & Restoration by BYG
EXISTING BUILDING BEFORE UNDER-PINNING PROCESS St. Joseph Novitiate Conservation & Restoration by BYG
PROPOSED LEVEL 1 FLOOR PLAN St. Joseph Novitiate Conservation & Restoration by BYG
PROPOSED LEVEL 2 FLOOR PLAN St. Joseph Novitiate Conservation & Restoration by BYG
PROPOSED LEVEL 3 FLOOR PLAN St. Joseph Novitiate Conservation & Restoration by BYG
Micro pile works at St. Joseph internal corridor area UNDER-PINNING PROCESS 1 St. Joseph Novitiate Conservation & Restoration by BYG
Ground beam and slab re-construction at perimeter columns area. UNDER-PINNING PROCESS 2 St. Joseph Novitiate Conservation & Restoration by BYG
Ground beam and slab re-construction at perimeter columns area. UNDER-PINNING PROCESS 3 St. Joseph Novitiate Conservation & Restoration by BYG
Ground beam and slab re-construction at internal area. UNDER-PINNING PROCESS 4 St. Joseph Novitiate Conservation & Restoration by BYG
Excavation work started from ground floor. UNDER-PINNING PROCESS 5 St. Joseph Novitiate Conservation & Restoration by BYG
Excavation work continued underneath St. Joseph Novitiate (basement for podium). UNDER-PINNING PROCESS 6 St. Joseph Novitiate Conservation & Restoration by BYG
First layer of excavation work completed for basement 1 podium, propping was done internally to support St.Joseph building. UNDER-PINNING PROCESS 7 St. Joseph Novitiate Conservation & Restoration by BYG
Excavation work continued for basement 2 podium. UNDER-PINNING PROCESS 8 St. Joseph Novitiate Conservation & Restoration by BYG
Basement 1 and 2 ground beam and slab in progress. UNDER-PINNING PROCESS 9 St. Joseph Novitiate Conservation & Restoration by BYG
Basement 1 and 2 floor slab and beam connecting to below St. Jo surrounding structures. UNDER-PINNING PROCESS 10 St. Joseph Novitiate Conservation & Restoration by BYG
Construction of basement 1 slab connecting to St. Jo. UNDER-PINNING PROCESS 11 St. Joseph Novitiate Conservation & Restoration by BYG
Level 1 slab connecting to St. Joseph building. UNDER-PINNING PROCESS 12 St. Joseph Novitiate Conservation & Restoration by BYG
COMPLETION OF UNDER-PINNING PROCESS St. Joseph Novitiate Conservation & Restoration by BYG
CONSERVATION IN PROGRESS St. Joseph Novitiate Conservation & Restoration by BYG
CONSERVATION IN PROGRESS St. Joseph Novitiate Conservation & Restoration by BYG
CONSERVATION IN PROGRESS St. Joseph Novitiate Conservation & Restoration by BYG
THE GROOMING TALE OF TWO BUILDINGS ; BMW & PENANG PLAZA
LOCATION Burmah Road, Georgetown, Penang
PHOTOS : BEFORE & AFTER Main façade view from Jalan Burmah Pre-refurbishment Post-refurbishment
PHOTOS : BEFORE & AFTER Side view from Jalan Anson Prerefurbishment Postrefurbishment
PHOTOS : POST-REFURBISHMENT
PHOTOS : POST-REFURBISHMENT
PHOTOS : POST-REFURBISHMENT Double volume gallery of BMW Showroom View from L2 café into double volume gallery
EXISTING BUILDING BEFORE RENOVATION Penang Plaza Rejuvenation by BYG
Before ELEVATION FACING BURMAH ROAD 2 Penang Plaza Rejuvenation by BYG
Before ELEVATION FACING BURMAH ROAD 1 Penang Plaza Rejuvenation by BYG
Existing drop off area New floating glass canopy at drop off area FACADE RENOVATION Penang Plaza Rejuvenation by BYG
Existing single volume entrance New triple-volume and welcoming entrance ENTRANCE RENOVATION Penang Plaza Rejuvenation by BYG
Existing facade with small window slits Existing shop fronts and corridor New shop fronts and corridor New facade with glass panels and mild steel screen SHOP FRONT & FACADE RENOVATION Penang Plaza Rejuvenation by BYG
Existing escalator before relocation New location for existing escalator EXISTING ESCALATOR RELOCATION Penang Plaza Rejuvenation by BYG
INTERIOR RENOVATION Penang Plaza Rejuvenation by BYG
NEW FACADE AT NIGHT Penang Plaza Rejuvenation by BYG
Thank you PREPARED BY : BYG ARCHITECTURE SDN. BHD. MARCH 2011