Government of India Ministry of Power North Eastern Regional Power Committee NERPC Complex, Dong Parmaw, Lapalang, Shillong - 793006, Meghalaya Email: nerpc@ymail.com website: www.nerpc.nic.in SPEED POST/FAX Ph : 0364-2534077 Fax: 0364-2534040 No. NERPC/COM/RTA/2016/793-811 Dtd 6 th November 2017 To 1. CMD, TSECL, Bidyut Bhawan, Agartala 799 001 2. Engineer-in-Chief (P&E), P&E D., Govt. of Mizoram, New Secretariat Complex, Khatla, Aizawl 796 001 3. Director (Distribution), MeECL, Lumjingshai, S.R. Road, Shillong 793 001 4. Chief General Manager (Comml.), APDCL, Bijuli Bhawan, Paltan Bazar, Guwahati-781 001. 5. MD, MSPDCL, Secure Office Building Complex, 3 rd Floor, South Block, Near 2 nd MR Gate, Imphal 795001 6. Chief Engineer (E Zone), Dept. of Power, Govt. of Arunachal Pradesh, Itanagar 791 111 7. Chief Engineer (Power), Dept. of Power, Govt. of Nagaland, Kohima 797 001 8. Executive Director (Comml.), NEEPCO Ltd., Lower New Colony, Shillong 793 003 9. Executive Director (Comml.), NHPC Ltd., NHPC Office Complex, Sector-33, Faridabad, Haryana-121003 10. Managing Director, OTPC, 6 th Floor, IFCI Tower, 61 Nehru Place, New Delhi 110 019 11. GM (Comml), NTPC Limited, ER-II HQ, Plot No. N-17/2, Third Floor, Naya Palli, Bhubaneswar-751012 12. Executive Director, NERTS, POWERGRID, Lapalang, Shillong 793 006 वषय: Oct 2017 क अन तम य स मसन ख त Sub: Provisional Regional Transmission Account for Oct, 2017. मह दय, Sir, Oct 2017 क अन तम य स मसन ख त अ वल कन तथ आव यक अगल क य व ह क लय एनइआरप स क व बस इट www.nerpc.nic.in पर ज र कर दय गय ह The provisional Regional Transmission Account (RTA) for the month of Oct 2017 has been uploaded on NERPC website www.nerpc.nic.in for observation and further necessary action. The Accounts is also attached herewith. स घटक अपन ट पण आरट ए क च लन त थ क 15 दन क अ दर भ ज सकत ह क ई स पक थ पत न ह न पर ज र कय गय आरट ए अ तम म न ज एग Constituents may send their observation/ comments, if any on the same within 15 days from the date of issue of RTA. In case no communication is received from constituents, the RTA as issued would be treated as final RTA. Yours faithfully, (B. Lyngkhoi) Director/ SE Commercial Copy for kind information to: 1. CE (G. M.), CEA, SewaBhawan, R.K.Puram, New Delhi 110 066. 2. General Manager, NERLDC, Dongtieh, Lower Nongrah, Lapalang, Shillong-793006. 3. Member Secretary, NRPC,18-A,Shaheed Jeet Singh Marg,Katwaria Sarai, NewDelhi-110016. 4. Member Secretary, ERPC,14, Golf Club Road, Kolkata- 700 033. 5. Member Secretary, WRPC, Plot No F-3,MIDC Area, Opp Seepz,Marol,Andheri (E), Mumbai-400 093. 6. Member Secretary, SRPC, 29, Race Course Road, Bangalore- 560009. 7. ED (Comml), MSPDCL, Secure Office Building Complex, 3 rd Floor, South Block, Near 2 nd MR Gate, Imphal 01 Director/ SE (Comml)
Approved Withdrawal given by NLDC Organisation Approved Withdrawal (in MW) DICs (Demand): Arunachal Pradesh 161.967126 ASEB 1112.198966 Manipur 194.477802 MeECL 252.056654 Mizoram 105.721658 Nagaland 133.153493 Tripura 311.007475 HVDC BNC 2.275000 Page 1
Abstract of Transmission charges for Approved Long Term and Approved Medium term Injection/ Withdrawal Figure in Rupees Demand/ Injection Zone PoC Charges Reliability Support Charges HVDC Charges Total Arunachal Pradesh Arunachal Pradesh 29681285.68 3931104.12 1208112.79 34820502.58 ASEB Assam 326651724.12 26994181.10 8295892.09 361941797.31 Manipur Manipur 35639029.61 4720170.73 1450609.93 41809810.26 MeECL Meghalaya 18352497.03 6117667.05 1880090.58 26350254.67 Mizoram Mizoram 31050345.23 2565970.36 788577.85 34404893.44 Nagaland Nagaland 28077544.45 3231768.43 993191.90 32302504.79 Tripura Tripura 22644765.26 7548462.43 2319804.76 32513032.44 HVDC BNC Assam 668165.23 55216.53 16969.23 740350.98 Page 2
Form-1 A : Details for Transmission Charges towards LTA Demand Zone Approved Withdrawal (MW) PoC Demand Rate ( Rs / MW/ Month) PoC Charges ( Rs ) Arunachal Pradesh Arunachal Pradesh 161.97 183255 29681285.68 ASEB Assam 1112.20 293699 326651724.12 Manipur Manipur 194.48 183255 35639029.61 MeECL Meghalaya 252.06 72811 18352497.03 Mizoram Mizoram 105.72 293699 31050345.23 Nagaland Nagaland 133.15 210866 28077544.45 Tripura Tripura 311.01 72811 22644765.26 HVDC BNC Assam 2.28 293699 668165.23 Page 3
Form-2 A : Details for Reliability Support Charges towards LTA Demand Zone Approved Withdrawal (MW) Reliability Support Rate ( Rs / MW/ Month) Reliability Support Charges ( Rs ) Arunachal Pradesh Arunachal Pradesh 161.97 24271 3931104.12 ASEB Assam 1112.20 24271 26994181.10 Manipur Manipur 194.48 24271 4720170.73 MeECL Meghalaya 252.06 24271 6117667.05 Mizoram Mizoram 105.72 24271 2565970.36 Nagaland Nagaland 133.15 24271 3231768.43 Tripura Tripura 311.01 24271 7548462.43 HVDC BNC Assam 2.28 24271 55216.53 Page 4
Form-3 A : Details for HVDC Charges towards LTA Demand Zone Approved Withdrawal (MW) HVDC Rate ( Rs / MW/ Month) HVDC Charges ( Rs ) Arunachal Pradesh Arunachal Pradesh 161.97 7459 1208112.79 ASEB Assam 1112.20 7459 8295892.09 Manipur Manipur 194.48 7459 1450609.93 MeECL Meghalaya 252.06 7459 1880090.58 Mizoram Mizoram 105.72 7459 788577.85 Nagaland Nagaland 133.15 7459 993191.90 Tripura Tripura 311.01 7459 2319804.76 HVDC BNC Assam 2.28 7459 16969.23 Page 5