Government of India Ministry of Power North Eastern Regional Power Committee NERPC Complex, Dong Parmaw, Lapalang, Shillong - 793006, Meghalaya Email: nerpc@ymail.com website: www.nerpc.nic.in SPEED POST/FAX Ph : 0364-2534077 Fax: 0364-2534040 No. NERPC/COM/RTA/2016/2235-53 Dtd 4 th August 2017 To 1. CMD, TSECL, Bidyut Bhawan, Agartala 799 001 2. Engineer-in-Chief (P&E), P&E D., Govt. of Mizoram, New Secretariat Complex, Khatla, Aizawl 796 001 3. Director (Distribution), MeECL, Lumjingshai, S.R. Road, Shillong 793 001 4. Chief General Manager (Comml.), APDCL, Bijuli Bhawan, Paltan Bazar, Guwahati-781 001. 5. MD, MSPDCL, Secure Office Building Complex, 3 rd Floor, South Block, Near 2 nd MR Gate, Imphal 795001 6. Chief Engineer (E Zone), Dept. of Power, Govt. of Arunachal Pradesh, Itanagar 791 111 7. Chief Engineer (Power), Dept. of Power, Govt. of Nagaland, Kohima 797 001 8. Executive Director (Comml.), NEEPCO Ltd., Lower New Colony, Shillong 793 003 9. Executive Director (Comml.), NHPC Ltd., NHPC Office Complex, Sector-33, Faridabad, Haryana-121003 10. Managing Director, OTPC, 6 th Floor, IFCI Tower, 61 Nehru Place, New Delhi 110 019 11. GM (Comml), NTPC Limited, ER-II HQ, Plot No. N-17/2, Third Floor, Naya Palli, Bhubaneswar-751012 12. Executive Director, NERTS, POWERGRID, Lapalang, Shillong 793 006 वषय: July 2017 क अन तम य स मसन ख त Sub: Provisional Regional Transmission Account for July, 2017. मह दय, Sir, July 2017 क अन तम य स मसन ख त अ वल कन तथ आव यक अगल क य व ह क लय एनइआरप स क व बस इट www.nerpc.nic.in पर ज र कर दय गय ह The provisional Regional Transmission Account (RTA) for the month of July 2017 has been uploaded on NERPC website www.nerpc.nic.in for observation and further necessary action. The Accounts is also attached herewith. स घटक अपन ट पण आरट ए क च लन त थ क 15 दन क अ दर भ ज सकत ह क ई स पक थ पत न ह न पर ज र कय गय आरट ए अ तम म न ज एग Constituents may send their observation/ comments, if any on the same within 15 days from the date of issue of RTA. In case no communication is received from constituents, the RTA as issued would be treated as final RTA. Yours faithfully, (B. Lyngkhoi) Director/ SE Commercial Copy for kind information to: 1. CE (G. M.), CEA, SewaBhawan, R.K.Puram, New Delhi 110 066. 2. General Manager, NERLDC, Dongtieh, Lower Nongrah, Lapalang, Shillong-793006. 3. Member Secretary, NRPC,18-A,Shaheed Jeet Singh Marg,Katwaria Sarai, NewDelhi-110016. 4. Member Secretary, ERPC,14, Golf Club Road, Kolkata- 700 033. 5. Member Secretary, WRPC, Plot No F-3,MIDC Area, Opp Seepz,Marol,Andheri (E), Mumbai-400 093. 6. Member Secretary, SRPC, 29, Race Course Road, Bangalore- 560009. 7. ED (Comml), MSPDCL, Secure Office Building Complex, 3 rd Floor, South Block, Near 2 nd MR Gate, Imphal 01 Director/ SE (Comml)
Approved Withdrawal given by NLDC Organisation Approved Withdrawal (in MW) DICs (Demand): Arunachal Pradesh 161.967126 ASEB 1112.198966 Manipur 194.477802 MeECL 252.056654 Mizoram 105.721658 Nagaland 133.153493 Tripura 311.007475 HVDC BNC 2.275000 Page 1
Abstract of Transmission charges for Approved Long Term and Approved Medium term Injection/ Withdrawal Figure in Rupees Demand/ Injection Zone PoC Charges Reliability Support Charges HVDC Charges Total Arunachal Pradesh Arunachal Pradesh 33207957.88 4496855.29 1438268.08 39143081.24 ASEB Assam 352964127.25 30879092.09 9876326.82 393719546.16 Manipur Manipur 34412263.63 5399481.69 1726962.88 41538708.21 MeECL Meghalaya 58757178.67 6998100.94 2238263.09 67993542.70 Mizoram Mizoram 33551508.22 2935256.11 938808.32 37425572.65 Nagaland Nagaland 27300327.52 3696873.58 1182403.02 32179604.11 Tripura Tripura 28830703.94 8634811.54 2761746.38 40227261.85 HVDC BNC Assam 721987.18 63163.10 20202.00 805352.28 Page 2
Form-1 A : Details for Transmission Charges towards LTA Demand Zone Approved Withdrawal (MW) PoC Demand Rate ( Rs / MW/ Month) PoC Charges ( Rs ) Arunachal Pradesh Arunachal Pradesh 161.97 205029 33207957.88 ASEB Assam 1112.20 317357 352964127.25 Manipur Manipur 194.48 176947 34412263.63 MeECL Meghalaya 252.06 233111 58757178.67 Mizoram Mizoram 105.72 317357 33551508.22 Nagaland Nagaland 133.15 205029 27300327.52 Tripura Tripura 311.01 92701 28830703.94 HVDC BNC Assam 2.28 317357 721987.18 Page 3
Form-2 A : Details for Reliability Support Charges towards LTA Demand Zone Approved Withdrawal (MW) Reliability Support Rate ( Rs / MW/ Month) Reliability Support Charges ( Rs ) Arunachal Pradesh Arunachal Pradesh 161.97 27764 4496855.29 ASEB Assam 1112.20 27764 30879092.09 Manipur Manipur 194.48 27764 5399481.69 MeECL Maeghalaya 252.06 27764 6998100.94 Mizoram Mizoram 105.72 27764 2935256.11 Nagaland Nagaland 133.15 27764 3696873.58 Tripura Tripura 311.01 27764 8634811.54 HVDC BNC Assam 2.28 27764 63163.10 Page 4
Form-3 A : Details for HVDC Charges towards LTA Demand Zone Approved Withdrawal (MW) HVDC Rate ( Rs / MW/ Month) HVDC Charges ( Rs ) Arunachal Pradesh Arunachal Pradesh 161.97 8880 1438268.08 ASEB Assam 1112.20 8880 9876326.82 Manipur Manipur 194.48 8880 1726962.88 MeECL MeECL 252.06 8880 2238263.09 Mizoram Mizoram 105.72 8880 938808.32 Nagaland Nagaland 133.15 8880 1182403.02 Tripura Tripura 311.01 8880 2761746.38 HVDC BNC Assam 2.28 8880 20202.00 Page 5