CANDLEWOOD elementary school Years of Previous work (since 1988) 1988 009 8.011 94,04 1 45 Replace Panel, Upgrade Fire Alarm System, Upgrade Smoke & Duct Detectors - Fall 00 Replace Sewer Lines under Building - Fall 00 Modifications to Life Skills - Fall 00 Add ADA/TAS Compliant Room Signage - Fall 00 Minor Library Expansion - Fall 00 Repair Roof Leaks Thru Wall Flashing - Spring 019 Refurbish Metal Roof - Spring 019 Clinic & Lounge Relocation - Fall 00 Playground Shade Structure 30 x40 - Fall 00 campus needs $79,780 $1,398,900 $61,50 $10,000 $348,000 $100,000 $60,000 $10,000 $7,000 $,494,930
CONVERSE elementary school Years of Previous work (since 007) 007.14 115,880 1 38 Repair Amphitheater and Site Drainage Playground - Fall 00 Shade Structure 30 x40 - Fall 00 $450,000 $7,000 $477,000
CORONADO VILLAGE elementary school Years of Previous work (since 1988) 1970 009 5.916 68,56 3 7 Replace Roof - Fall 00 ADA sidewalk to Playground Equipment - Fall 00 Replace Gym Flooring with Resilient Sports Floor - Complete Replace Roof (Gym) - - Fall 00 Provide Covered Walkways between Classrooms & Gym - Fall 00 Playground Shade Structure 30 x40 - Summer 018 $1,537,500 $,800 $65,50 $75,600 $80,000 $7,000 $1,788,40
CRESTVIEW elementary school Years of Previous work (since 1974) 1974 1994 7 66,184 3 30 Add Secure Entry Vestibule - Fall 00 Provide Accessible Curb Ramps to Main Entrance - Fall 00 Replace Egress Doors - Fall 00 Add ADA/TAS Compliant Room Signage - Fall 00 Kitchen Addition, Stage Addition, and Minor Cafeteria Renovations - Fall 00 Replace Gym Flooring With Resilient Sports Floor - Summer 018 Replace Roof (Gym) - Fall 00 Renovate Toilet Rooms - Fall 00 Playground Shade Structure 30 x40 - Fall 00 $60,000 $36,000 $8,500 $10,000 $3,444,000 $65,50 $75,600 $836,400 $7,000 $4,637,00
ELOLF elementary school Years of Previous work (since 1993) 1993 10.30 9,847 1 47 Add Secure Entry Vestibule - Complete Replace Chillers - Complete Replace Corroded Galvanized Water Pipes Campus Wide - Fall 00 Replace Roof (Original Building) - Complete Life Skill Modifications - Fall 00 Provide ADA/TAS Compliant Room Signage - Fall 00 Kitchen Addition and Minor Cafeteria Renovations - Fall 00 Minor Library Expansion - Fall 00 Playground Shade Structure 30 x 40 - Fall 00 Relocate Clinic & Lounge - Fall 00 $60,000 $50,000 $187,500 $1,391,955 $61,50 $8,000 $,460,000 $348,000 $7,000 $10,000 $5,003,705
FRANZ elementary school Years of Previous work (since 1968) 1968 008 6.3 59,543 Add Outdoor Parking and Security Lighting - Fall 019 ADA Sidewalk to Playground Equipment - Fall 019 Replace Gym Flooring with Resilient Sports Floor - Complete Replace Roof (Gym) - Fall 019 Replace Roof - Fall 019 Upgrade Flooring to Match Throughout Campus - Summer 019 Playground Equipment Replacement -Spring 019 Playground Shade Structure 30'x40 - Spring 019 $50,000 $3,850 $65,50 $75,600 $760,515 $135,000 $85,000 $7,000 $1,40,485
HARTMAN elementary school Years of Previous work (since 00) 00 008 18.376 97,476 1 4 1 Add Secure Entry Vestibule - Fall 018 Replace Carpeting In Corridors With VCT - Complete Remove Wall Covering In Corridor - Complete Playground Shade Structure 30 x40 - Complete $60,000 $75,50 $37,500 $54,000 $6,750
HOPKINS elementary school Years of Previous work (since 1969 ) 1969 003 11.89 105,741 44 1 Add Secure Entry Vestibule - Complete Replace Chillers - Complete Improve Drainage Next to Gym - Spring 019 Mechanical Ductwork Modifications - Summer 00 ADA Sidewalk to Playground Equipment - Spring 019 Replace Roof (Gym) - Complete $60,000 $50,000 $61,500 $100,000 $8,050 $75,600 $555,150
MASTERS elementary school Years of Previous work (since 008) 008 009 16.53 94,53 1 38 The above listed campus is programmed to receive the following item: Playground Swings- 1 bay 5" arch swing frame - Spring 019 $1,450 $1,450
MILLER S POINT elementary school Years of Previous work (since 1986) 1986 1991 8.91 8,101 40 Renovate Administration Area to Centralize; Add Secure Entry Vestibule - Fall 00 Kitchen Addition; Minor Cafeteria Renovations - Fall 00 Remove Wall Covering in Corridor - Complet Remodel PPCD Restroom - Fall 00 Add Kinder Playground Equipment and Shade Structure - Fall 00 $1,065,000 $,460,000 $64,800 $60,000 $15,000 $3,774,800
OLYMPIA elementary school Years of Previous work (since 1978) 1978 1985 7 64,767 3 30 Renovate Administration Area to Centralize; Add Secure Entry Vestibule - Fall 00 Kitchen Addition; minor Cafeteria renovations - Fall 00 Remove Carpet in Classroom and Add VCT - Complete Remove Carpet in Corridor and Add VCT - Complete Replace Gym Flooring with Resilient Sports Floor - Complete Replace Roof (Gym) - Fall 00 Playground Shade Structure 30 x 40 and Kinder Playground Equip. Replacement - Fall 00 $315,000 $,400,000 $14,100 $40,000 $65,50 $75,600 $10,000 $3,1,0
PARK VILLAGE elementary school Years of Previous work (since 1999) 1999 009.5 77,770 34 1 Add Secure Entry Vestibule - Fall 00 Replace Roof (Annex) - Complete Kitchen Addition & Minor Cafeteria Renovations - Fall 00 Replace Roof (Original) - Complete Replace Roof (Gym) - Complete Attach Gym and 1-classroom Wing to Building - Fall 00 Playground Shade Structure 30 x 40 - Fall 00 1 Playground Equipment Replacement - Fall 00 $60,000 $58,375 $,460,000 $373,500 $75,600 $4,50,000 $54,000 $15,000 $7,656,475
PASCHALL elementary school Years of Previous work (since 000) 000 0 104,43 47 6 Add Secure Entry Vestibule - Fall 00 Replace Chillers - Complete Regrade and Excavate Under Floor - Fall 00 Add 6-ft Chainlink Fence at Bus Loop to Secure Campus (45 LF); Replace front 4-ft Chainlink Fence with 6-ft High Fence (350 LF) - Complete Playground Shade Structure 30 x40 - Fall 00 Repair Roof Drainage - Complete Kitchen Addition; Minor Cafeteria Renovations - Fall 00 $60,000 $50,000 $1,00,000 $15,500 $7,000 $100,000 $,460,000 $4,11,500
ROLLING MEADOWS elementary school Years of Previous work (since 009) 009 16.34 109,31 1 4 The above listed campus is programmed to receive the following item: Install Portable Classrooms - Complete $150,000 $150,000
SALINAS elementary school Years of Previous work (since 005) 005 19.38 101,105 1 39 Add 6-ft Chainlink Fence at Playground Area by Gym - Complete Playground Shade Structure 30 x40 - Complete $5,500 $54,000 $59,500
SPRING MEADOWS elementary school Years of Previous work (since 1984) 1984 1991 8.906 79,606 36 Renovate Administration Area to Centralize; Add Secure Entry Vestibule - Fall 00 Replace Sewer System - Fall 00 Replace Roof (Classroom Annex) - Fall 019 Add ADA/TAS Compliant Signage - Fall 00 Remove Carpet in Classrooms; Install VCT - Complete Replace Gym Flooring with Resilient Sports Floor - Complete Replace Roof (Gym) - Fall 00 $600,000 $750,000 $139,90 $8,000 $188,500 $65,50 $75,600 $1,86,910
WOODLAKE elementary school Years of Previous work (since 1978) 1978 199 9.37 73,489 3 44 Renovate Administration Area to Centralize; Add Secure Entry Vestibule - Fall 00 Upgrade Fire Alarm System, Smoke Detectors & Duct Detectors - Spring 019 Replace Roof - Fall 019 Add ADA/TAS Compliant Signage - Fall 00 Kitchen Addition; Minor Cafeteria Renovations - Fall 00 Replace Library (4,850sf); Remodel old Library Space (,300sf); Convert to New Classrooms and Staff Restrooms - Fall 00 VCT for Classrooms and Café - Complete Replace Gym Flooring with Resilient Sports Floor - Complete Replace Roof (Gym - Fall 019 1 Playground Structure Replacement - Fall 00 Playground Shade Structure 30 x 40 - Fall 00 $315,000 $360,000 $10,300 $8,000 $,460,000 $1,430,000 $141,800 $65,50 $75,600 $100,000 $54,000 $5,0,0
JUDSON middle school Years of Previous work (since 1985) 1985 1987 6.775 81,641 5 19 Secure Public Entrance (after hours near front office) - Spring 01 Upgrade Smoke Detector to Addressable Devices ADA - Spring 019 Upgrades based on TEA Audit - Spring 01 Upgrade Life Skills Room - Spring 01 Overlay Asphalt Parking and Drives - Spring 01 Add ADA/TAS Compliant Room Signage - Spring 01 Replace Flooring Campus Wide - Fall 019 Replace Gym Bleachers - Fall 018 $3,000 $,00 $31,000 $150,000 $700,406 $0,000 $1,039,805 $90,000 $,076,411
KIRBY middle school Years of Previous work (since 1964) 1964 014 19.015 193,999 7 51 Replace Main Switchgear - Summer 00 Replace Roof (700 Buildings) - Summer 00 Raze & Replace 600 Building (Gym/Athletics) - Summer 00 Raze 400 Building; Replace 100, 500 Buildings (Admin/Athletics) - Summer 00 Upgrade Sound System at Fine Arts - Complete Repair Bus Loop - Summer 00 Retrofit Lighting at 100, 00, 700 Buildings (CPS Rebate) - Summer 00 Relocate and Replace Water Line Under Sidewalks - Summer 00 Replace Bleachers at Sports Field - Complete $750,000 $409,500 $10,080,000 $10,000,000 $40,000 $50,000 $115,87 $10,000 $40,000 $1,605,37
KITTY HAWK middle school Years of Previous work (since 1975) 1975 009 4 197,95 13 71 Replace Roofs (100, 400, 500, 600, 1000, and 1100 Buildings) - Spring 00 Replace Panel Boards, Switchgear, & Transformer - Spring 00 Replace Bus Loop - Spring 00 Raze & Replace 1300 Building (Gym) - Spring 00 Raze & Replace 00, 300, 100 Buildings (Acad) - Spring 00 Replace Sewer Piping at 400 Building - Spring 00 Retrofit Lighting (CPS Rebate) - Spring 00 Add ADA/TAS Compliant Room Signage - Spring 00 $1,15,000 $750,000 $519,580 $10,340,000 $7,980,000 $150,000 $47,173 $15,000 $1,16,753
METZGER middle school Years of Previous work (since 00) 00 005 51.739 1,89 1 51 Secure Entry Vestibule - Spring 019 Repair Dilution Tanks and Chemical Drain Lines - Complete Remove Carpet in Classrooms; Replace with VCT - Fall 019 Replace Carpet (Not in Classrooms) - Complete $0,000 $5,000 $195,500 $35,50 $76,00
WOODLAKE HILLS middle school Years of Previous work (since 1996) 1996 37.717 169,145 1 6 Repair/Replace Chiller - Complete Replace Tennis Courts; Repair Soil Retainers; Repair Student Drop Off; Replace Roof - Complete Retrofit Light Fixtures (CPS Rebate) - Complete Repair/Replace Acid Dilution Tanks - Complete Replace Stage Lighting - Fall 00 & Sound System - Complete Relocate Life Skills Restroom and Add Shower - Spring 01 Replace VCT Floor in Corridor - Complete $600,000 $4,548,400 $53,718 $5,000 $10,000 $160,000 $15,000 $5,7,118
JUDSON high school Years of Previous work (since 008) 008 014 54.77 439,73 131 3 Motorized Shades - Commons Area J118 - Fall 018 Remodel Ag Farm Complex - Complete $45,000 $350,000 $395,000
VETERANS MEMORIAL high school Years of Previous work (since -) 016 160 60,850 Varies N/A campus assessment Three story classroom addition that will increase the campus enrollment by 800 students - Spring 01 Black Box Theater with associated support spaces - Spring 01 500 seat Auditorium with associated support spaces - Spring 01 Major improvements to the Softball and Baseball fields- Spring 019
WAGNER high school Years of Previous work (since 003) 003 011 100.00 419150 68 7 Lightning Protection - Complete Retrofit Lighting - 46 Chandelier Fixtures at Main Corridor - Complete Retrofit Lighting - Replace Canister Lights at Auditorium - Complete LED Marquee 8 x 5 - Fall 01 Remedy Heaving Piping on Main Water Line to Campus - Spring 01 ADA Room Sign Replacement & Graphics Package - Spring 01 Xeriscape Landscaping at All Building Entrances - Fall 019 Repair Buckling Roof Drains - Complete Re-direct Scuppers to Not Drain into Building - Complete $0,000 $65,090 $0,000 $75,000 $150,000 $45,000 $150,000 $150,000 $150,000 $1,05,090
PERFORMING ARTS CENTER Years of Previous work (since 1996) 1996 18.61 66,899 1 1 Replace Chiller - Complete Replace Low Slope Built-Up Roof - Fall 019 Replace Carpet - Complete $450,000 $1,305,000 $69,88 $1,84,88
RUTLEDGE STADIUM Years of Previous work (since 007) 007 Included w/ Alt. 33,677 11 The above listed campus is programmed to receive the following item: Replace Parking at Stadium (600 Spaces)- Complete $1,43,460 $1,43,460
SECONDARY alternative school Years of Previous work (since 1955) 1955 1984 10 136,380 3 47 Add Secure Entry Vestibule - Spring 01 ADA Upgrades based on TEA Audit - Complete Add Parking (68 Spaces) - Spring 01 Retrofit Lighting Throughout Campus Replace all T1 Fixtures with LED - Complete Provide ADA/TAS Compliant Room Signage - Complete Add Identifying Signage - Complete Replace Gym Flooring with Resilient Sports Floor - Complete Replace Roof (Gym) - Summer 019 $80,000 $44,000 $89,760 $169,000 $8,000 $15,000 $65,50 $75,600 $546,880
POLICE DEPARTMENT Years of Previous work (since -) Included in JECC Included in JECC Included in JECC 1,98 Included in JECC ADA Upgrades based on TEA Audit - Complete Retrofit Lighting - Replace all T1 Fixtures to LED - Complete $46,000 $6,960 $5,960
JISD TRANSPORTATION Years of Previous work (since 1976) 1976 005 8.959 4,158 The above listed campus is programmed to receive the following item: Roof Replacement - Repair Garage on School Street - Fall 019 $148,500 $148,500