Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

Similar documents
Distribution List: Constituents of Southern Region.

The 44 th. meeting of STU Coordination

Summary Record of discussions in the 45 th meeting of STU Coordination Committee held on under the chairmanship of Spl.

Meeting Notice (ब ठक क स चन )

5.0 Transmission system analysis for the interconnection. In general transmission system analysis comprises load flow studies, reliability studies

Psalms of Jesus I The Message of the Prophets II The Message of the Prophets Appeal to All Walks of Life III Upholding the Law of the Pro

The Work Of The Holy Spirit

वषय: Oct 2017 क अन तम य स मसन ख त Sub: Provisional Regional Transmission Account for Oct, मह दय, Sir,

MYA: Power Transmission Improvement Project

वषय: July 2017 क अन तम य स मसन ख त Sub: Provisional Regional Transmission Account for July, मह दय, Sir,

वषय: February 2018 क अन तम य स मसन ख त Sub: Provisional Regional Transmission Account for February, मह दय, Sir,

PLANNING COMMISSION MINUTES

Mount Olive Evangelical Lutheran Church th Ave NW Rochester, MN (507)

At the end of each part are summary questions. The summary questions are to help you put together what you learned in the preceding chapters.

No. F.1(2)2016/UTTIPEC/53rd /D-3 I t. Dated:

MIND AND MEMORY TRAINING

CONSTITUTION CHURCH OF OUR LORD JESUS CHRIST OF THE APOSTOLIC FAITH, INC. ARTICLE I ORGANIZATION

Data Interpretation Pie Chart Question for Bank Exams (SBI Clerk, IBPS Clerk, SBI PO Pre, IBPS PO Pre, IBPS SO Pre, & RRB Scale I Pre)

FORMS (Updated 6 February 2019) I Declaration De Fideli Administratione... 2 II Edict of Vacancy in a Pastoral Charge... 2 III Form of Call to a

BAHAUDDIN ZAKARIYA UNIVERSITY, MULTAN. Sr.No. Subject Paper Code No.

Study Guide On Mark. By Dr. Manford George Gutzke

Every parent Grandparent Christian adult (for that matter) should be impassioned about influencing the Next Generation.

Frankenstein Study Guide:

Remit 6 Study Session #2. Basis of Union Foundational Document Essential Agreement 20 Articles of Faith

Advance Publishing Company Records,

Review of Clergy Terms of Service

Class-JSC. Section-A1 Group -Rose. Conducted By Rashida Akther Asst. Teacher Dept. Of English

Prayer Station I. Stained glass cross on front wall of church

TODMORDEN THE GREAT WAR. A Local Record. AND By JOHN A. LEE. odmorden : PRINTED AND PUBLISHED BY WADDINGTON & SONS, " NEWS " OFFICE

Sub: Regional Transmission Account for the month of October, Reg

BYLAWS. The Rock of the Christian and Missionary Alliance

!!! More%Catholic%than%Rome:% Art%and%Lay%Spirituality%at%Venice's%Scuola%di%S.%Fantin,%1562B1605% By% Meryl%Faith%Bailey%

Sharpen Your Faith Week 3, Prayer

THE BOOK OF CHURCH ORDER OF THE ORTHODOX PRESBYTERIAN CHURCH STUDY QUESTIONS

CONSTITUTION EVANGELICAL LUTHERAN CHURCH IN CANADA

NWYM of Friends Initial Restructuring Meeting Saturday, February 18, 2017 North Valley Friends Church

Parable of the Ten Virgins Matthew 25:1-13

RULES AND REGULATIONS of the EMANUEL SYNAGOGUE CEMETERY

The Southern Baptist Theological Seminary Fall, 2008 SYLLABUS

CONSTITUTION EASTERN SYNOD EVANGELICAL LUTHERAN CHURCH IN CANADA 2018

THEALLIANCE 2017 MANUAL. of The Christian and Missionary Alliance

Sermon-based Study Guide

How to Handle Relationship Rifts Philippians 4:2-3. Pastor Troy Dobbs Grace Church of Eden Prairie. November 8, 2015

Read Tertium Organum The Third Canon Of Thought A Key To The Enigmas Of The World

THOMAS TOLMAN FAMILY ORGANIZATION BY-LAWS ARTICLE I NAME. The name shall be: Thomas Tolman Family Organization. ARTICLE II PURPOSES AND OBJECTIVES

Christian Training Center of Branch of the Lord

THE LIFE-GIVING MYTH ANTHROPOLOGY AN13 ETFINOGRAPE-IY

Hymnology A Survey of the Times Lyrics

BYLAWS OF CASPER ALLIANCE CHURCH. Casper, WY. Adopted at the Membership Meeting March 1, 2015 ARTICLE I NAME ARTICLE II RELATIONSHIP

*Essays are found in the lesson Resources and Omnibus Textbook

Sri Lanka s Participation in BRICS and BIMSTEC Outreach Summit 2016

The Gift of Salvation

The Principal Doctrines of Epicurus

Keynote Address by Mr. R. V. Shahi - Former Power Secretary, Government of India

Sh. Rajive Chawla, President, FSIA with the ZDH-SEQUA officials and participants of the training programme

Study Guide On Mark By Dr. Manford George Gutzke

I read an article this week entitled: 6 Things No One Tells You About Being A Parent

THE CONSTITUTION AND STATUTES OF THE CATHEDRAL CHURCH OF SAINT PETER IN EXETER

The Doctrine of Christ "Christology" Course Outline

THE CONSTITUTION OF DURAL BAPTIST CHURCH

Notes: The Wings To Awakening. Introduction

Understanding the Bible

Constitution. Synod of Alberta and the Territories Evangelical Lutheran Church in Canada

2017 Africa West Area Plan Broadcast by the Area Presidency Presented February 26, 2017

RIGHT OF INURNMENT AGREEMENT

SUMMATIVE ASSESSMENT - II,

Louis Rosenblum (b. 1923) is a retired scientist who directed the Solar and

Leeds Methodist Mission Management Committee. Leeds (Mission Circuit) Meeting

INDEX to LEGISLATIVE ACTS and REGULATIONS of the GENERAL ASSEMBLY From 1931 (revised to 2015) Note: References are to Acts unless Reg is stated.

100 BIBLE LESSONS LESSON 53 THE COMMANDS OF CHRIST

THE SECRETS OF HEALING PRAYER. E. Anthony Allen

Understanding the Bible

CONTENTS III SYNTHETIC A PRIORI JUDGEMENTS. PREFACE CHAPTER INTRODUCTldN

Annual Health Survey:

PLANNING COMMISSION MEETING AUGUST 11, :00 P.M. The meeting was called to order at 7:00 p.m. by Chairman Darby.

www. worldwisdom.com/public/library/default.aspx I III

Which word or phrase MOST describes your life right now? - Stressed Out! - Burned Out! - Wigged Out! - Worn Out! - Ready to tap out!

Statement of Safeguarding Principles

MARKING SCHEME KASSU 2017 CRE PAPER 2 MARKING SCHEME

CONCEPT OF IMMORTALITY IN PLATO S PHAEDO

The Chief Engineer/TS, HVPNL, Panchkula. The Chief Engineer/TS, HVPNL, Hisar. Memo. No.Ch- 61 /GBT-187/Loose

Contents Contents VOLUME VOLUME VOLUME III TESTS & ANSWER KEY

C&MA Accredited Local Church Constitution

Finding Contentment. Philippians 4: Pastor Troy Dobbs Grace Church of Eden Prairie. November 29, 2015

REASONS AND ENTAILMENT

The next ASC mtg. begins at 4 p.m. on Sunday, November 5th, 2017, at Fairview Baptist Church 900 Charlotte St. Fredericksburg.

CONTENTS. INTRODUCTORY Chapter I ETHICAL NEUTRALITY AND PRAGMATISM

CONSTITUTION AND BY-LAWS. of the COWETA INDEPENDENT BAPTIST CHURCH. Preamble

XVII. READERSHIP ACT (AS AMENDED BY ACT XII 2003, IV 2005, VI 2006, VI 2007, XlV 2012, XII 2014 AND XIII 2018) Edinburgh, 18th May 1992, Session 4.

MEMORANDUM. Interested Parishes in the Episcopal Diocese of Louisiana. From: Covert J. Geary, Chancellor of the Diocese

Doug Swanney Connexional Secretary Graeme Hodge CEO of All We Can

Understanding the Bible

Different editions of the Suvaraprabhāsottamasūtra, its transmission and evolution

PREFACE 1 TO A BRIEF STATEMENT OF FAITH PRESBYTERIAN CHURCH (U.S.A.)

BYLAWS OF FIRST BAPTIST CHURCH 1100 Malone Denton, Texas

THE GENESIS CLASS THE GREAT GLOBAL FLOOD. The Six Days of Creation. After Their Kind. Descent from a Common Ancestor. Geologic Time Scale

Rebekah, Promised Bride for the Promised Son

FIRST CONGREGATIONAL CHURCH, UNITED CHURCH OF CHRIST, COLUMBUS, OHIO

QUESTION PAPER TEST- III (ANCIENT INDIA)

Sample Alliance Church (Sample local church bylaws interspersed with Constitution)

Transcription:

File No.CEA-PS-11-21(19)/3/2018-PSPA-I Division I/2742/2018(5) 1. 4. 7. Member, Secretary, 2. NRPC, 18-A Shajeed Jeet Singh Sansanwal Marg, Katwaria Sarai, New Delhi - 110016 (Fax-011-26865206) Director (Technical), 5. Punjab State Transmission Corporation Ltd. (PSTCL) Head Office The Mall Patiala -147001 Fax-0175-2304017 Director (PP&D) 8. rd RVPN, 3 Floor, Room no 330, Vidhyut Bhawan, Janpath, Jaipur-302005. Fax-:0141-2740794 Director (W &P) 3. UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow - 226 001 (Fax:0522-2287822) Member (Power) BBMB, Sectot-19 B Madhya Marg, Chandigarh-1 60019 (Fax-01 72-2549857 6. Director (Technical) 9. HVPNL Shakti Bhawan, Sector-6 Panchkula-134109 Fax-0172-256060640 Director (Projects) PTCUL, Vidhyut Bhawan, Near ISBT -Crossing, Saharanpur Road, Majra, Dehradun-248002. Uttrakhand Fax-0135-2645744 Director (Operation) Delhi Transco Ltd. Shakti Sadan, Kotla Marg, New Delhi-110002 (Fax-01123234640) Director (Technical) HPSEB Ltd. Vidut Bhawan, Shimla -171004 Fax-0177-2813554 ce.ppm@rvpn.co.in 10. 13. Managing Director, HPPTCL, Barowalias, Khalini Shimla-171002 Fax-0177-2623415 11 Chief Engineer 12. (Operation). Ministry of Power, UT Secretariat, Sector-9 D Chandigarh -161009 Fax-0172-2637880 Director (Projects) 14 CEO, 15 POWERGRID. POSOCO Saudamini Plot no. 2, B-9, Qutab Sector - 29. Institutional Area, Gurgaon-122 001 Katwaria Sarai (Fax-0124-2571809) New Delhi 110010 (Fax:2682747) Agenda Note -2nd meetng of NRSCT 2 Development Commissioner (Power), Power Department, Grid Substation Complex, Janipur, Jammu, Fax: 191-2534284 COO (CTU) POWERGRID, Saudamini, Plot no. 2, Sector -29, Gurgaon-122 001 (Fax-0124-2571809) 60

File No.CEA-PS-11-21(19)/3/2018-PSPA-I Division I/2742/2018(5) Agenda note for 2nd Meeting of Northern Region Standing Committee on Transmission 1.1 Confirmation of the Minutes of the 1st meeting of Northern Region Standing Committee on Transmission held on 11th September 2018. 1.2 The Minutes of 1st meeting of Northern Region Standing Committee on Transmission (NRSCT) of were issued vide CEA letter no. CEA-PS-11-21(19)/2/2018-PSPA-I Division /I/2611/2018 (4) dated 23rd Oct., 2018. No comments have been received from the constituents. Therefore, the minutes of the 1 st meeting of NRSCT may please be confirmed. 2.0 Evolution of transmission scheme for integration of envisaged RE generation capacity in Solar & Wind Energy Zones and Transmission Schemes for Solar Energy Zones (REZs) in Rajasthan. 2.1 The transmission scheme for integration of envisaged RE generation capacity in Solar & Wind Energy Zones and Transmission Schemes for Solar Energy Zones (REZs) in Rajasthan was deliberated in 1st meeting of NRSCT held on 11.9.2018. The scheme mainly envisaged the following SEZs (10 GW) in Rajasthan based on Stage-II applications already received near Fatehgarh, Bikaner and Bhadla as well as Potential pockets in Western Rajasthan as indicated by SECI for SEZ phase-i development: Part-A: i) Fatehgah SEZ (4 GW) (Fathegarh-I : 2 GW, Fathegarh-II : 2.8 GW) ii) Phalodi / Bhadla SEZ ( 3 GW) (Bhadla-I : 0.8 GW, Bhadla-II : 2.2 GW) iii) Bikaner Pugal SEZ (1.85 GW) Part-B: i) 2.2 Ramgarh / Kuchcheri SEZ (1.15 GW) The transmission system evolved through system studies was deliberated in 1 st meeting of NRSCT held on 11.9.2018 in Delhi, wherein, it was agreed that a separate meeting of CEA, CTU, RVPNL and HVPNL would be called on 20 th September, 2018 to further deliberate and study the proposed scheme. Therefore, a meeting was held on 20.9.2018 in Gurgaon, wherein, RVPN and HVPN had suggested some modifications in their intrastate network. Based on their suggestions, revised studies were carried out for various scenario like off peak, Solar minimised / maximised, peak demand for the proposed transmission scheme. It was decided that the scheme may be prioritised out of phase-i Rajasthan REZ capacity (10 GW) considering LTA / Stage-II connectivity applications and some future potential at the locations where the applications are received. Accordingly, following transmission system was evolved: Transmission system for evacuation of power from Fatehgarh (4 GW), Phalodi/Bhadla (3 GW), Bikaner (1.85GW) i) Establishment of 765/400/220kV, 3x1500MVA, 5x500 MVA pooling station at suitable location near Phalodi / Bhadla in Jodhpur (Bhadla-2) ii) Establishment of 765/400kV, 2x1500 MVA S/s at suitable location near Khetri iii) Augmentation of transformation capacity at Bhadla (PG) by 2x500MVA, 400/220kV(6th & 7th) transformers Agenda Note -2nd meetng of NRSCT 3 61

File No.CEA-PS-11-21(19)/3/2018-PSPA-I Division I/2742/2018(5) iv) Creation of 220 kv level at Bikaner (PG) with transformation capacity of 2x500MVA, 400/220kV transformers v) LILO of 765kV Ajmer Bikaner D/c line (both ckts) at Bhadla-II - 135km vi) Bhadla-II Bhadla (PG) 400kV D/c Line (Twin HTLS) - 30 km vii) Bikaner (PG) Khetri S/s 765kV D/c line - 220 km viii) LILO of both ckts of 765kV Phagi Bhiwani D/c line at Khetri S/s - 10 km ix) Khetri Sikar (PG) 400 kv D/c line (twin HTLS) 70 km x) Augmentation of 1x1500MVA,765/400kV transformer (3rd) at Moga S/s xi) Augmentation of 1x1000MVA,765/400kV transformer (3rd) at Bhiwani (PG) xii) Establishment of Transformation capacity at Fatehgarh (TBCB) with 3x500MVA, 400/220kV transformers@ xiii) Establishment of 765/400/220kV, 5x1500MVA, 6x500 MVA pooling station at suitable location near Fatehgarh in Jaisalmer Distt (Fatehgarh-II) xiv) Fatehgarh-II Bhadla -II 765kV D/c line -130km xv) LILO of both circuits of Fatehgarh (TBCB) Bhadla (PG) 765 kv D/c line (op. at 400 kv) at Fatehgarh-II 20km xvi) Charging of Fatehgarh-II Bhadla section of the line at 765kV level xvii) Ajmer (PG) Jhatikara 765kV D/c line -360 km xviii) 1x125 MVAr (420kV), 1x240 MVAr (765 kv) Bus Reactors each at Fatehgarh-II, Bhadla-II & Khetri Substation xix) 1x330 MVAR Switchable Line reactors for each circuit at each end of Ajmer and Jhatikara Ajmer Jhatikara 765kV D/c line xx) 1x240 MVAr Switchable line reactor for each circuit at each end of Bikaner Khetri 765kV D/c line xxi) 1x330 MVAr Switchable line reactor at for each circuit at Bhadla-II end for Ajmer-Bhadla-II 765kV D/c line (after LILO) xxii) 220kV line bays for interconnection of solar projects at Fatehgarh-II, Fatehgarh, Bhadla, Bhadla-II and Bikaner S/s- to be discussed in view of CERC regulation xxiii) Provision of 220kV Bus couplers etc. and common facilities at pooling/substation i.e. Fatehgarh, Fatehgarh-II, Khetri, Bhadla-II, Bikaner, Bhadla under ISTS as per regulation under the scope of ISTS Part B: Transmission system for evacuation of power from Ramgarh / Kuchcheri in Fatehgarh (1.15 GW*) i) ii) Establishment of 400/220kV 3x500 MVA pooling station at suitable location in Jaisalmer Distt (near Ramgarh/Kuchheri) Ramgarh/Kuchheri pooling station Fatehgarh-II 400 kv 2xD/c Line (Twin HTLS on M/c tower) -150 km Agenda Note -2nd meetng of NRSCT 4 62

File No.CEA-PS-11-21(19)/3/2018-PSPA-I Division I/2742/2018(5) iii) iv) v) Ramgarh/Kuchheri pooling sttation Jaisalmer -II (RVPN) 400 kv D/c Line (Twin HTLS)- 60 km 220kV line bays for interconnection of solar projects at Ramgarh/Kuchheri pooling station-- to be discussed in view of CERC regulation Provision of 220kV Bus couplers +TBC & common facilities at Ramgarh/Kuchheri PS *It may be mentioned that out of 2.5 GW potential in Ramgarh/Kuchcheri, about 1.5 GW potential can be evacuated through transmission corridor identified above at Part (B). Additional transmission requirement for balance 1 GW (balance Ph-1), if any, may be evolved based on the requirement subsequently. @ Based on the requirement of stage-ii connectivity at 220 kv level. May be reviewed 2.3 Subsequently, as requested by RVPNL, a meeting was held on 9.10.2018 (copy of the minutes enclosed as Annexure I) under the Chairmanship of Director (Op) & Director (Tech), RVPN in RVPN office Jaipur, wherein, following transmission system was technically agreed for evacuation of power from the projects for which applications for Stage-II/LTA in Phalodi/Bhadla, Fatehgarh & Bikaner complex has been received as well as some part of future potential in above locations: i) Establishment of 765/400/220kV, 3x1500MVA (765/400kV), 5x500 MVA (400/220kV) pooling station at suitable location near Phalodi/ Bhadla in Jodhpur (Bhadla-II) ii) Establishment of 765/400kV, 2x1500 MVA S/s at suitable location near Khetri iii) Augmentation of transformation capacity at Bhadla (PG) by 400/220kV, 2x500MVA (6th & 7th) transformers iv) Creation of 220 kv level at Bikaner (PG) with transformation capacity of 2x500MVA, 400/220kV transformers v) LILO of both circuits of Ajmer Bikaner 765kV D/c line at Bhadla-II vi) Bhadla-II Bhadla (PG) 400kV D/c Line (Twin HTLS) vii) Bikaner(PG) Khetri S/s 765kV D/c line viii) LILO of both circuits of Phagi Bhiwani 765kV D/c line at Khetri S/s ix) Khetri Sikar (PG) 400kV D/c line (Twin HTLS) x) Augmentation with 765/400kV, 1x1500MVA transformer (3rd) at Moga S/s xi) Augmentation with 765/400kV, 1x1000MVA, transformer (3rd) at Bhiwani (PG) S/s xii) Establishment of Transformation capacity at Fatehgarh (TBCB) with 3x500MVA, 400/220kV transformers xiii) Establishment of 400/220kV, 4x1500MVA (765/400kV), 5x500 MVA (400/220kV) pooling station at suitable location near Fatehgarh in Jaisalmer Distt (Fatehgarh-II) xiv) Fatehgarh-II Bhadla -II 765kV D/c line Agenda Note -2nd meetng of NRSCT 5 63

File No.CEA-PS-11-21(19)/3/2018-PSPA-I Division I/2742/2018(5) xv) LILO of both circuits of Fatehgarh (TBCB) Bhadla (PG) 765 kv D/c line (op. at 400kV) at Fatehgarh-II so as to establish Fatehgarh (TBCB) Fatehgarh -II 765 kv D/c line (to be op. at 400kV) and Fatehgarh-II-Bhadla (PG) 765kV D/c line xvi) Charging of Fatehgarh-II Bhadla section at 765kV level xvii) Ajmer (PG) Jhatikara 765kV D/c line xviii) 1x125 MVAr (420kV), 2x240 MVAr (765kV) Bus Reactor each at Fatehgarh-II, Bhadla-II & Khetri Substation xix) 1x330 MVAR Switchable Line reactors for each circuit at each end of Ajmer Jhatikara 765kV D/c line xx) 1x240 MVAr Switchable line reactor for each circuit at each end of Bikaner Khetri 765kV D/c line xxi) 1x330 MVAr Switchable line reactor for each circuit at Bhadla-II end for AjmerBhadla-II 765kV line (after LILO) xxii) 1x240 MVAr Switchable line reactor for each circuit at Bhadla-II end for BikanerBhadla-II 765kV line (after LILO) xxiii) 220kV line bays for interconnection of solar projects at Fatehgarh-II (9 nos), Bhadla-II (9 nos) and Bikaner (4 nos) S/s 2.4 It was also decided that scheme for evacuation of power from Ramgarh/Kuchcheri in Jaisalmer & additional potential of Rajasthan SEZ may be taken up subsequently based on stage-ii connectivity/lta application. The study results are given as Annexure-II. 2.5 Members may concur the above proposed system. 3.0 Replacement of conductors of one circuit of 220kV Ludhiana Lalton Kalan line ( 3 circuits) and Verpal -Mall Mandi 132kV line with HTLS conductor: PSTCL proposal regarding 3.1 National Power Committee (NPC), CEA vide their letter dated 24-10-2018 has sent record note of discussions of a meeting with PSTCL representatives regarding PSTCL s proposal for replacement of conductors of one circuit of 220kV Ludhiana Lalton Kalan 220kV line (2-3 km) and Verpal -Mall Mandi 132kV line (12km) with HTLS conductor for PSDF funding. The Techno Economic Subgroup (TESG), who had examined the proposal, in its meeting held on 22.10.2018 has, interalia, sought recommendation of NRSCT on the above proposal. 3.2 PSTCL vide their e-mail dated 30-10-2018 has provided sketches (shown below) of existing 220 kv network inter-connection between Ludhiana (PG) and Laltonkalan (PSTCL) and proposed rearrangement at Laltonkalan (PSTCL) after which, there would be 2 no. 220 kv circuits between Ludhiana (PG) and Laltonkalan (PSTCL). PSTCL has indicated loading on these line during paddy season for past three years i.e. from 2016 to 2018, which is of the order of 640A touching 695A this year. PSTCL has also provided load flow studies (enclosed at Annexure-III) with rearrangement at Laltonkalan (PSTCL) and power flow on remaining two circuits is 175 MW and 252 MW. Agenda Note -2nd meetng of NRSCT 6 64

File No.CEA-PS-11-21(19)/3/2018-PSPA-I Division I/2742/2018(5) Agenda Note -2nd meetng of NRSCT 7 65

File No.CEA-PS-11-21(19)/3/2018-PSPA-I Division I/2742/2018(5) 3.3 PSTCL also informed that the present peak load on Verpal -Mall Mandi 132kV line (panther conductor) is of the order of 80 MW. Therefore, PSTCL has proposed for replacement of one circuit of Ludhiana (PG) and Laltonkalan (PSTCL (Zebra conductor) and Verpal -Mall Mandi 132kV line (Panther conductor) with HTLS conductors to provide relief to these overloaded lines. 3.4 PSTCL may present. Members may deliberate. Agenda Note -2nd meetng of NRSCT 8 66

File No.CEA-PS-11-21(19)/3/2018-PSPA-I Division I/2742/2018(5) 4.0 Issue related to signing of Transmission Agreement/LTA Agreements for implementation of UITP Scheme (deemed ISTS) by PTCUL for evacuation of power from various Generators: 4.1 To deliberate on the issue related to signing of Transmission Agreement/LTA Agreements for implementation of UITP Scheme (deemed ISTS) by PTCUL for evacuation of power from various Generators, a meeting was held on 12.9.2018 in CEA involving NTPC, THDC, L&T, Lanco, SJVNL, PTCUL, CTU and POSOCO. Minutes of the meeting are enclosed as Annexure-IV. 4.2 Subsequently, PTCUL vide their letter dated 20.10.2018 has forwarded following observations on the minutes of the meeting: 1. Point no. 2 read with (v) - Baramwari Srinagar D/c Line..CEA stated that for implementation of above proposal PTCUL may apply for connectivity/lta for the quantum of power to be exchanged through ISTS at Baramwari Switching Station. CEA also pointed out that Baramwari Switching Station would be required in matching time frame of Phatabyoung. Therefore, PTCUL needs to start the implementation process for the same. PTCUL s observation During meeting it was informed to PTCUL that if power from SHP s of UJVNL is to be evacuated through 220 kv S/s Baramwari (ISTS network) then UJVNL will have to bear applicable PoC (ISTS) Charges. It was not discussed that PTCUL will have to apply for connectivity/lta to CTU for the quantum of power to be exchanged through ISTS at Baramwari Switching Station. Accordingly, this point needs to be modified. 2. Point no. 6.Regarding query raised by PTCUL for signing of transmission agreements with generators, CTU stated that the matter has already been discussed with PTCUL number of times and as per para no. 7.3 of Detailed Procedure of CERC (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-state Transmission and related matters) Regulations, 2009: In all the cases where dedicated transmission system up to point of connection is to be undertaken by CTU / Inter-State Transmission licensee, the applicant after grant of connectivity shall sign transmission agreement as per the format given at FORMATCON-8 within one month of the grant of connectivity Therefore, a tripartite agreement needs to be signed between CTU, PTCUL and generation developers. In addition, it was also informed that Implementation Agreement is signed between generator and POWERGRID wherever implementation of the transmission system is taken up by POWERGRID PTCUL S observation The above para needs to be started/modified in line with the actual submission made by PTCUL as follows: - Agenda Note -2nd meetng of NRSCT 9 67

File No.CEA-PS-11-21(19)/3/2018-PSPA-I Division I/2742/2018(5) PTCUL stated that as per CERC Connectivity Regulations, Transmission Agreement is signed for dedicated lines only. Here, all the transmission elements to be implemented by PTCUL are part of ISTS network and there is no need of signing of a separated Transmission Agreement for the same. CTU, vide its letter dated 23.06.2016 to M/s L&T (copy enclosed as Annexure I) has also clarified that Transmission Agreement as per FORMAT-CON-8 is not needed as the transmission line is built by the deemed ISTS licensee under coordinated transmission system planning. Members may like to deliberate. 5.0 Any other agenda item with the permission of chair. Agenda Note -2nd meetng of NRSCT 10 68

Annexure I

168458 BIKANER-NW 769.9 164480 FATEHG-2 389.5 168459 BHADLA PG 763.6 1000.0 0.0H SP 164460 FATEHGARH 389.2 1100.0 53.5 1098.2 83.0 395.8 1950.0 0.0H S 162498 BHADLA-2 216.6 1950.0 196.1 187703 MOGA-PG 765.4 2349.6 167.7 2292.2 76.0 168417 AJMER-NW 776.2 167774 KHETRI 772.5 167773 JAIPURR 774.4 187704 BHIWN-PG 765.0 292.4 265.3 292.4 265.3 2223.3 130.6 2256.0 243.0 2374.0 210.2 2395.0 2.3 850.0 0.0H S 164458 BIKANER-NW 398.8 1406.1 271.1 164404 BHADLA 396.8 514.4 15.6 958.1 25.6 164417 AJMER-NW 440.1 0.4 439.9 16.1 439.9 16.1 1645.9 45.7 1645.9 45.7 TO CHITTORGARH 2800.0 SZ 212.6 350.0 187708 JHATI-PG 766.9 2178.0 81.7 2178.0 81.7 164774 KHETRI 403.6 241.5 20.2 120.7 8.9 120.7 8.9 220.1 87.2 220.1 87.2 800.0 0.0H S2 162359 BHADLA-PG 215.8 3346.5 472.2 250.0 0.0H SP 162397 ADANI 216.6 0.0 124.5 0.1 500.0 0.0H SP 162398 SOURYA 217.3 248.0 7.8 250.0 0.0 0.0H SP 162399 ESSEL 220.0 375.0 0.0 360.9 66.3 955.5 147.7 946.3 144.3 395.0 202.0 421.9 224.3 400.8 166.4 125.7 2047.2 76.4 146.4 135.9 367.1 202.4 366.7 19.0 TO MEERUT 2187.4 234.4 3748.5 198.5 982.2 242.7 TO MEERUT 168498 BHADLA-2 763.8 416.5 184477 JHATIK_S 394.4 1965.0 475.3 184463 JHATI-PG 397.6 2129.7 298.5 545.7 39.4 545.7 39.4 519.1 14.0 519.1 14.0 982.7 125.5 982.2 180.3 165.9 445.2 241.4 TO ALIGARH TO AGRA 1000.0 0.0H 162458 BIKANER 218.6 999.9 84.4 2800.0 164498 BHADLA-2 395.8 0.0H 2607.3 TO MUNDKA TO KARAMPURA 2248.3 125.0 TO BIKANER(RVPN) TO BIKANER(RVPN) TO MERTA 405.9 TO AJMER(RVPN) TO AJMER(RVPN) TO SIKAR TO BHINMAL TO KANKROLI 162480 FATEH-2 750.0 TO BASSI TO MERTA Transmission Scheme for Rajasthan SEZ 727.4 TO HERAPURA TO GWALIOR TO ANTA TO DWARKA TO BAMNOLI 164451 JAIPUR_RS 384.3 164459 BHADLA PG 402.3 164110 JAISALMER-2 4996.3 1201.7 13.1 1200.0 0.0H S1 328.9 164403 RAMGARH 399.3 164401 AKAL-4 402.0 43.3 55.8 43.3 55.8 77.9 26.2 164402 BARMER-4 401.7 148.1 28.5 28.5 113.9 25.3 400.8 246.5 9.0 164434 JODHPUNEW-4 402.6 408.5 20.6 317.1 46.8 36.5 4.4 49.5 47.0 148.1 364.0 35.8 19.6 194.7 36.9 193.1 22.0 34.7 107.4 188.9 75.1 188.9 75.1 546.4 3.0 218.0 554.9 202.5 328.6 29.3 164433 JODHPU-4 164413 RAJWEST 257.8 40.1 40.1 257.8 530.0 76.8 530.0 76.8 538.2 3.5 538.2 3.5 400.4 113.9 38.5 193.1 38.5 193.1 38.5 430.9 13.4 893.2 12.0 757.5 978.8 160.2 972.2 36.4 1379.6 102.7 1384.6 296.2 1113.6 304.6 1110.8 107.5 1704.4 270.4 1693.6 60.1 2235.0 299.6 215.0 2209.0 168480 FATEH-NEW S1 830.0 0.0H 301.9 17.1 189.9 25.1 477.1 21.0 2.6 19.2 299.8 11.6 193.3 28.4 19.7 2.5 1 1 1131.2 39.3 250.0 0.0H 1 Annexure II

Annexure-III 220kV Ludhiana Lalton Kalan 220kV line (2-3 km) Verpal -Mall Mandi 132kV line

Annexure IV